12.01.2013 Views

9600 Service Manual - gmecorp-usa.com

9600 Service Manual - gmecorp-usa.com

9600 Service Manual - gmecorp-usa.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Generator Calibration 25<br />

5R VERIFICATION PROCESS<br />

This is the process to ensure <strong>com</strong>pliance with FDA requirements 80-8035, Section<br />

1020.32, part D2.<br />

NOTE: The Dynalyzer should not be connected during this procedure. The following<br />

equipment is required to perform the entrance exposure tests:<br />

• Keithley Model 35050 dosimeter with Model 96030 ion chamber or equivalent<br />

(Calibration must be current).<br />

• Metric Scale or Ruler<br />

• Lead Apron or lead plate<br />

• Probe Holding Fixture<br />

NOTE: To protect the image intensifier from being over driven, place a lead plate or several<br />

folds of lead apron over the face plate, under the holding fixture.<br />

WARNING... Steps within this procedure produce X-rays. Use appropriate precautions.<br />

1. Select FLUORO MANUAL mode, set the technique to 40 kV and 5.0 mA.<br />

2. Select NORMAL field size.<br />

3. Center an ion chamber in the X-ray beam 12” (30 cm) above the II as shown below.<br />

Figure 8 - Dosimeter and Ion Chamber Set-up for 5R/Min Output

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!