12.01.2013 Views

9600 Service Manual - gmecorp-usa.com

9600 Service Manual - gmecorp-usa.com

9600 Service Manual - gmecorp-usa.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power Distribution 3<br />

WORKSTATION CIRCUIT BREAKERS<br />

CB1 A 10 Amp, reset only breaker, on the AC cord assembly. In line with in<strong>com</strong>ing AC<br />

to the Workstation.<br />

CB2 A 10 Amp, reset only breaker, located below the point of connection of the<br />

interconnect cable. In line with AC going to the C-Arm.<br />

CB3 A 5 Amp, reset only breaker, in line with AC to be distributed thru the Workstation.<br />

Located on earlier models on the left side of the Workstation by the Power Control<br />

PCB. Accessed by removing rear panel, left side panel, and protective clear<br />

plastic cover. The location on later models is next to CB2 by the interconnect<br />

cable.<br />

POWER SUPPLY PS1<br />

+12V, -12V, +5V, -5V<br />

LOCATED INSIDE<br />

ELECTRONICS BOX<br />

ON THIS HINGED PANEL<br />

CIRCUIT BREAKER CB3<br />

ON EARLIER MODELS<br />

(WORKSTATION AC) AND<br />

TERMINAL BLOCK TB2<br />

POWER<br />

CONTROL PCB<br />

ISOLATION<br />

TRANSFORMER T1<br />

POWER<br />

SUPPLY PS2 (+24V)<br />

Figure 2 Workstation Power Components<br />

SURGE<br />

SUPPRESSOR<br />

PCB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!