FUKUYA IINO<br />

Negative Possible Direct Environmental Impacts Positive Possible Indirect Environmental Impacts<br />

On-site Emergency Situations Research Activities<br />

TV Aerial Interference Training and Capacity Building<br />

Waste Management Networking and Dissemination<br />

Water Consumption Local Events<br />

For more <strong>de</strong>tails, please refer to a UNU’s document entitled, the I<strong>de</strong>ntification of Significant Environmental<br />

Aspects.<br />

Internal Audit<br />

UNU-EMS 4.5.4 <strong>de</strong>scribes the Procedure for Audit, Review, and Continual Improvement. It is the<br />

UNU’s policy to conduct internal audits once per annum to evaluate the performance of the EMS<br />

and to i<strong>de</strong>ntify and correct non-conformances. The audits will seek to <strong>de</strong>termine whether the<br />

EMS:<br />

22<br />

• Conforms with the planned arrangements for environmental management in line with<br />

ISO14001.<br />

• Has been properly implemented and maintained.<br />

Internal audit team visits all unit lea<strong>de</strong>rs and some randomly selected members in each unit. The<br />

interviews are conducted using a checklist <strong>de</strong>veloped by UNU Steering Group, which contains possible<br />

questions to be asked to interviewees. In addition to using the checklist, auditors also need<br />

to utilize the opportunity to communicate with interviewees, by soliciting interviewee’s personal<br />

views, comments and suggestions on UNU’s ISO14001 activities. On completion of the interviews<br />

the auditors will complete the relevant Observation/Non-Conformity Records and Corrective Measures<br />

and Preventative Actions Report. The latter must be approved and signed by the EMS Coordinator<br />

(Internal Audit Manual).<br />

Management Review<br />

UNU-EMS 4.6 articulates how the Management Review should be carried out. This review is <strong>de</strong>signed<br />

to monitor and evaluate the progress of this EMS’s goals, objectives and targets. The review<br />

is to be carried out, and the opinions, suggestions and <strong>de</strong>cisions properly documented to ensure<br />

that the implementation of the EMS is suitable, a<strong>de</strong>quate and effective. The results of the Internal<br />

Audit will be the main documentation reviewed (UNU EMS Manual 4.6).<br />

External Audit<br />

One renewal audit for certificate renewal and two annual surveillance audits in the second and<br />

third year during the period of three years are carried out by inviting external auditors. The auditors<br />

interview with key staff members including the Rector of the UNU, and discuss on i<strong>de</strong>ntified nonconformity,<br />

observation, opportunities of improvement, and noteworthy effort if any.<br />