27.06.2013 Views

Proceedings of the 12th European Conference on Knowledge ...

Proceedings of the 12th European Conference on Knowledge ...

Proceedings of the 12th European Conference on Knowledge ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Oscar Guerra and Janeth Rojas<br />

According to S<strong>on</strong>ia Castro y Oscar Guerra´s in 2010, when ECOPETROL was restructured and<br />

c<strong>on</strong>verted in an integrated company in <str<strong>on</strong>g>the</str<strong>on</strong>g> petroleum value chain, adopted <str<strong>on</strong>g>the</str<strong>on</strong>g> APQC (American<br />

Productivity and Quality Center) model to implement its new KM strategy, which was designed as a<br />

mix <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> best practices selected am<strong>on</strong>g approaches <str<strong>on</strong>g>of</str<strong>on</strong>g> its different former business units. In that<br />

way, it was established at first time <str<strong>on</strong>g>the</str<strong>on</strong>g> “General Policy for <strong>Knowledge</strong> and Technology Management<br />

at ECOPETROL” as a unique visi<strong>on</strong> this visi<strong>on</strong> c<strong>on</strong>tain: <str<strong>on</strong>g>the</str<strong>on</strong>g> statement, a basic principles, roles and<br />

resp<strong>on</strong>sibilities <str<strong>on</strong>g>of</str<strong>on</strong>g> key figures and means <str<strong>on</strong>g>of</str<strong>on</strong>g> communicati<strong>on</strong> and coordinati<strong>on</strong>.<br />

After that, a corporative program was structured to implement that unique visi<strong>on</strong>, including initiatives<br />

for:<br />

C<strong>on</strong>verting principles to operating elements.<br />

Instituti<strong>on</strong>alize roles and resp<strong>on</strong>sibilities.<br />

Install and operate <str<strong>on</strong>g>the</str<strong>on</strong>g> means <str<strong>on</strong>g>of</str<strong>on</strong>g> communicati<strong>on</strong> and coordinati<strong>on</strong> for <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose to facilitate <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

implementati<strong>on</strong> and operati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> KM Strategy.<br />

Tacit knowledge identificati<strong>on</strong>, capture and disseminati<strong>on</strong> within <str<strong>on</strong>g>the</str<strong>on</strong>g> company through a<br />

structured method, from people who could leave <str<strong>on</strong>g>the</str<strong>on</strong>g> company for <str<strong>on</strong>g>the</str<strong>on</strong>g> retirement benefit according<br />

to <str<strong>on</strong>g>the</str<strong>on</strong>g> Colombian law.<br />

Develop KM pilots <strong>on</strong> critical knowledge areas (key practices) defined by <str<strong>on</strong>g>the</str<strong>on</strong>g> top and medium<br />

managers, with a methodological measurement model as a guide.<br />

Install complementary strategies in human resources, informati<strong>on</strong> technology aspects and KM<br />

methods and tools, in order to leverage <str<strong>on</strong>g>the</str<strong>on</strong>g> cultural change, <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> KM pilots and <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

instituti<strong>on</strong>alizati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> model.<br />

3. Used process descripti<strong>on</strong><br />

This article describes <str<strong>on</strong>g>the</str<strong>on</strong>g> six steps used in ECOPETROL, and helped implement <str<strong>on</strong>g>the</str<strong>on</strong>g> acti<strong>on</strong>s to<br />

mitigate <str<strong>on</strong>g>the</str<strong>on</strong>g> risk <str<strong>on</strong>g>of</str<strong>on</strong>g> loss <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>sciousness in most <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> selected cases.<br />

Identify <str<strong>on</strong>g>the</str<strong>on</strong>g> populati<strong>on</strong> with high risk <str<strong>on</strong>g>of</str<strong>on</strong>g> decoupling<br />

Identify <str<strong>on</strong>g>the</str<strong>on</strong>g> key knowledge <str<strong>on</strong>g>of</str<strong>on</strong>g> each pers<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g>ir main functi<strong>on</strong>s and processes<br />

Assess <str<strong>on</strong>g>the</str<strong>on</strong>g> criticality <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge<br />

Awareness <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> people involved<br />

Trainer <str<strong>on</strong>g>of</str<strong>on</strong>g> Trainers Workshop<br />

Design <strong>Knowledge</strong> Transfer Plan<br />

3.1 Identificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> populati<strong>on</strong> with risk <str<strong>on</strong>g>of</str<strong>on</strong>g> decoupling<br />

Although <str<strong>on</strong>g>the</str<strong>on</strong>g> loss mitigati<strong>on</strong> knowledge initiative comes at ECOPETROL about <str<strong>on</strong>g>the</str<strong>on</strong>g> high number <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

people who can retire, this article suggests including people with <str<strong>on</strong>g>the</str<strong>on</strong>g> following characteristics:<br />

People with retirement expectati<strong>on</strong>s in a time less than or equal to three years<br />

People with temporary c<strong>on</strong>tracts<br />

People with permanent c<strong>on</strong>tracts with less than five years old<br />

Pers<strong>on</strong>s applying for successi<strong>on</strong> planning or area change request<br />

People with key knowledge for development and sustainability <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> processes<br />

3.2 Identificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> key knowledge<br />

To identify <str<strong>on</strong>g>the</str<strong>on</strong>g> key knowledge <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> people selected in <str<strong>on</strong>g>the</str<strong>on</strong>g> previous item, its main activities, functi<strong>on</strong>s<br />

and processes in charge, we suggests a survey <str<strong>on</strong>g>of</str<strong>on</strong>g> 360 ° to be evaluated by <str<strong>on</strong>g>the</str<strong>on</strong>g> immediate supervisor,<br />

an employee and a customer, people selected, and likewise <str<strong>on</strong>g>the</str<strong>on</strong>g> survey must be evaluated by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

people selected. In this way it has to have at least three different views about <str<strong>on</strong>g>the</str<strong>on</strong>g> key knowledge <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> people selected.<br />

Figures No. 4 and No. 5 show <str<strong>on</strong>g>the</str<strong>on</strong>g> documents suggested to c<strong>on</strong>duct <str<strong>on</strong>g>the</str<strong>on</strong>g> survey <str<strong>on</strong>g>of</str<strong>on</strong>g> 360 ° as an<br />

evaluator and evaluated versi<strong>on</strong>, respectively.<br />

382

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!