27.06.2013 Views

Proceedings of the 12th European Conference on Knowledge ...

Proceedings of the 12th European Conference on Knowledge ...

Proceedings of the 12th European Conference on Knowledge ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Eva-Maria Kern et al<br />

Figure 2: Traditi<strong>on</strong>al value stream mapping (Ro<str<strong>on</strong>g>the</str<strong>on</strong>g>r/Shook 2000)<br />

The result <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> mapping is transparency about <str<strong>on</strong>g>the</str<strong>on</strong>g> value stream, about significant points c<strong>on</strong>taining<br />

waste and about <str<strong>on</strong>g>the</str<strong>on</strong>g> corresp<strong>on</strong>ding amount <str<strong>on</strong>g>of</str<strong>on</strong>g> waste. This is <str<strong>on</strong>g>the</str<strong>on</strong>g> basis <str<strong>on</strong>g>of</str<strong>on</strong>g> optimizati<strong>on</strong>. As so<strong>on</strong> as<br />

initial process improvements have been realized, <str<strong>on</strong>g>the</str<strong>on</strong>g> cycle starts anew: up<strong>on</strong> mapping <str<strong>on</strong>g>the</str<strong>on</strong>g> changed<br />

current state, a new target state is determined and subsequently implemented in order to get closer to<br />

perfecti<strong>on</strong> (Ro<str<strong>on</strong>g>the</str<strong>on</strong>g>r/Shook 2000).<br />

The traditi<strong>on</strong>al producti<strong>on</strong> factor labor is c<strong>on</strong>sidered in a direct way, whereas land is not taken into<br />

account directly. It is implicitly included by mapping inventories between individual process steps, thus<br />

c<strong>on</strong>sidering <str<strong>on</strong>g>the</str<strong>on</strong>g> respective space requirement. As a result, c<strong>on</strong>clusi<strong>on</strong>s can be drawn about a possible<br />

waste <str<strong>on</strong>g>of</str<strong>on</strong>g> land.<br />

The producti<strong>on</strong> factor capital can also be taken into account with <str<strong>on</strong>g>the</str<strong>on</strong>g> help <str<strong>on</strong>g>of</str<strong>on</strong>g> an adapted form <str<strong>on</strong>g>of</str<strong>on</strong>g> value<br />

stream mapping, referred to as cost-oriented value stream planning (Balsliemke 2008).<br />

Summing up, it can be c<strong>on</strong>cluded that up to this day <str<strong>on</strong>g>the</str<strong>on</strong>g>re are relatively fully developed approaches to<br />

take all producti<strong>on</strong> factors into account in value stream mapping, apart from knowledge. Only for<br />

knowledge <str<strong>on</strong>g>the</str<strong>on</strong>g> integrati<strong>on</strong> is still in its early stages (e.g. Kern/Boppert 2010, Fiechter et al. 2011).<br />

A suitable basis for a value-oriented knowledge-integrating analysis and design <str<strong>on</strong>g>of</str<strong>on</strong>g> business<br />

processes should meet two elementary criteria: It has to facilitate a value-oriented analysis and<br />

design <str<strong>on</strong>g>of</str<strong>on</strong>g> business processes and it has to <str<strong>on</strong>g>of</str<strong>on</strong>g>fer <str<strong>on</strong>g>the</str<strong>on</strong>g> possibility <str<strong>on</strong>g>of</str<strong>on</strong>g> explicitly integrating and depicting<br />

knowledge elements. Being an established lean management tool visualizing resource c<strong>on</strong>sumpti<strong>on</strong><br />

during value creati<strong>on</strong> from <str<strong>on</strong>g>the</str<strong>on</strong>g> process perspective, value stream mapping clearly is suitable for<br />

analyzing and designing processes in a value-oriented way with respect to <str<strong>on</strong>g>the</str<strong>on</strong>g> traditi<strong>on</strong>al producti<strong>on</strong><br />

factors. <strong>Knowledge</strong> aspects can be examined and documented separately for each process step,<br />

while <str<strong>on</strong>g>the</str<strong>on</strong>g> flexible graphical representati<strong>on</strong> provides <str<strong>on</strong>g>the</str<strong>on</strong>g> possibility for integrating and depicting<br />

knowledge elements. Thus, value stream mapping can be c<strong>on</strong>sidered a suitable basis for a valueoriented<br />

knowledge-integrating analysis and design <str<strong>on</strong>g>of</str<strong>on</strong>g> business processes.<br />

4. Potential benefits and challenges <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> integrati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge into<br />

value stream mapping<br />

The benefits <str<strong>on</strong>g>of</str<strong>on</strong>g> integrating <str<strong>on</strong>g>the</str<strong>on</strong>g> factor knowledge into value stream mapping would be expected in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

field <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge identificati<strong>on</strong> and visualizati<strong>on</strong>:<br />

By integrating <str<strong>on</strong>g>the</str<strong>on</strong>g> factor knowledge into a value stream map, actual knowledge processes for each<br />

process step can be distinctly identified. The detailed process representati<strong>on</strong> facilitates <str<strong>on</strong>g>the</str<strong>on</strong>g> detailed<br />

499

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!