27.06.2013 Views

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 1: KEI <strong>and</strong> KI indexes (KAM) 2009<br />

Rank<br />

1 +2 Denmark<br />

Co un try (click o n the<br />

nam e to see basic<br />

scorecard)<br />

Ghassan Kbar <strong>and</strong> Abdul Aziz AlDusari<br />

KEI<br />

KI<br />

Eco no m ic<br />

Incentiv e<br />

Re gim e<br />

Innovation<br />

Education<br />

9.5 2 9.49 9.61 9.49 9.78 9.21<br />

2 -1 Sw e den 9.51 9.57 9.33 9.76 9.29 9.66<br />

3 -1 Finl<strong>and</strong> 9.37 9.39 9.31 9.67 9.77 8.73<br />

4<br />

N eth e rla nd s 9.3 5 9.39 9.22 9.45 9.21 9.52<br />

5 +2 Norway 9.31 9.25 9.47 9.06 9.60 9.10<br />

6 +6 Canada 9.17 9.08 9.45 9.44 9.26 8.54<br />

7 +2 Unite d Kingdom 9.10 9.06 9.24 9.24 8.49 9.45<br />

8 +6 Irel<strong>and</strong> 9.05 8.98 9.26 9.08 9.14 8.71<br />

9 -3 Unite d States 9.02 9.02 9.04 9.47 8.74 8.83<br />

10 -5 Sw itze r la n d<br />

9.0 1 9.09 8.79 9.90 7.68 9.68<br />

11 -3 A u str a lia 8.97 9.08 8.66 8.88 9.69 8.67<br />

12 +3 Ge rm any 8.96 8.92 9.06 8.94 8.36 9.47<br />

13 +4 Icel<strong>and</strong> 8.95 8.76 9.54 8.07 9.41 8.80<br />

14 -3 N ew Ze al<strong>and</strong> 8.92 8.97 8.79 8.66 9.78 8.46<br />

15 -5 Austria 8.91 8.78 9.31 9.00 8.48 8.85<br />

16 -3 B e lg ium 8.80 8.77 8.87 8.93 9.14 8.25<br />

17 +2 Luxembourg 8.64 8.37 9.45 9.00 6.61 9.51<br />

18 +3 Ta iw a n, Ch in a<br />

8.4 5 8.79 7.42 9.27 7.97 9.13<br />

19 +1 Singapore 8.44 8.03 9.68 9.58 5.29 9.22<br />

20 -4 Jap an 8.42 8.63 7.81 9.22 8.67 8.00<br />

2.1 Quantitative KBE assessment methodology<br />

In order to assess the performance of a sustainable nation’s knowledge based economy, there is a<br />

need to identify the main indicators that affect the KBE performance, as well as the elements related<br />

to them <strong>and</strong> how they are correlated to each other. There three are three main keywords associated<br />

with the sustainable KBE; knowledge, investment, <strong>and</strong> Business continuity. The first main indicator<br />

associated with KBE is the required knowledge which determines the level of competency <strong>and</strong> ability<br />

to play an important role for building a strong KBE. The second main indicator is investment, which is<br />

needed for developing projects required for the success of KBE. The third main indicator is continuity<br />

of business for sustainable KBE. These three indicators (knowledge, investment <strong>and</strong> business<br />

continuity KIC) are the one that needs to be measured <strong>and</strong> evaluated in order to measure the<br />

effectiveness of the KBE. Furthermore, the elements associated with each of these indicators have to<br />

be identified, as well as the correlation that exists among them. There is direct correlation between<br />

the knowledge <strong>and</strong> investment indicators since it is unlikely that an investment can be done without<br />

the existence of knowledge. However, there is less dependency among the first 2 indicators <strong>and</strong> the<br />

business continuity indicator since it is mainly depends on entrepreneurship, technology<br />

infrastructure, management <strong>and</strong> leadership. The main indicator of successful KBE is investment<br />

indicator which directly affects the nation economy. However, in order to quantify the investment<br />

indicator value, the effect of its elements including the knowledge indicator has to be assessed. The<br />

elements affect the value of investment indicator are knowledge, fund, technology infrastructure,<br />

skills/experience, <strong>and</strong> management. The percentage or the value of these elements has to be<br />

determined, <strong>and</strong> their values need to be optimized in order to maximize the overall investment<br />

252<br />

ICT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!