A Tree view (fig. 4) presents the hierarchy of Objective Groups <strong>and</strong> objectives. The important<br />

information that it shows is the default KPI. Each objective can contain a huge number of KPIs. The<br />

default KPI is the one that triggers alarms, revealing how targets are able to be met. Their status is<br />

listed in the Status column.<br />

Figure 4: Tree view<br />

A Detailed view (fig. 5) provides a list of objectives <strong>and</strong> their Objective Groups. This view also shows<br />

the actual results, anticipated results, <strong>and</strong> the percentage of deviation from the plan for each<br />

objective.<br />

Figure 5: Detailed view<br />