27.06.2013 Views

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bert Kleersnijder <strong>and</strong> Egon Berghout<br />

Figure 1: Scoring model with example (based on interview sessions <strong>and</strong> workshops, Groningen’s<br />

municipality, 2009-2010)<br />

Only one criterion can be rated from the 1 to 5 criteria, implying that there can be only one dominant<br />

need. Furthermore, the legal necessity is prevalent <strong>and</strong> dominates the other four criteria. When there<br />

are several top scoring necessities, for example, all are ‘legally necessary’, criteria from the column<br />

'business' may still have an impact. For example: When a business project has to be finished in 2010<br />

<strong>and</strong> a project on the basis of legal necessity has to be finished in March 2011, the project with the<br />

greatest pressure will receive a higher priority. Ratings can be assigned to all of the criteria from 6<br />

to10. All ratings have an option to score 0, 1 or 2. The overall scores determine the priority in the<br />

portfolio. Therefore, it is possible that multiple projects with similar scoring totals <strong>and</strong> identical<br />

priorities coexist. By <strong>using</strong> the prioritization technique, the portfolio of projects can be better assessed.<br />

It is also an instrument that helps with the financing of projects, with the planning of the capacity for<br />

projects <strong>and</strong> with the overall scheduling of projects. By applying the method, successful <strong>and</strong> timely<br />

completion of projects has improved significantly. The I&A’s support capacity is limited. When there is<br />

additional insight into the planning <strong>and</strong> prioritization of the projects, this capacity can be better used<br />

<strong>and</strong> controlled.<br />

The prioritization of projects will give an overview of the projects that contribute most to cost savings.<br />

Under severe budget cuts, the portfolio as a tool can be used to effectively deal with the resources<br />

<strong>and</strong> the depletion of resources through better monitoring, especially when the portfolio contains many<br />

projects, when many interests are involved <strong>and</strong> when the resources are limited. There are also many<br />

shared interests <strong>and</strong> similar starting positions. A lot of businesses are communal, similar or identical<br />

in their processes. The budgets are always limited, <strong>and</strong> are also being cut under the influence of<br />

economic cycles. Prioritization of projects is necessary for this reason alone. However, there are more<br />

reasons to prioritize <strong>and</strong> govern: there is limited manpower to implement the projects, projects overlap<br />

<strong>and</strong> the absorption capacity of the organization has its limits (Bonham, 2004; Glaser, 2006;<br />

Berenschot, 2001). In this method, prioritization criteria are established based on interviews with<br />

employees involved in the projects of the organization, after which the scores to weigh the projects<br />

were developed. The prioritization tool, the project portfolio included for this research, is realized in an<br />

excel sheet. The organization has presented two parts with developed criteria : the first part<br />

containing five criteria is the 'necessity' of the project (in the sequence Legal need, Political priority,<br />

Public interest, Organizational need, <strong>and</strong> Technical need). Furthermore, the second part has five<br />

criteria that concern the 'business' (Communality, Time, Return, ICT vision, <strong>and</strong> Finance).<br />

The project portfolio also contains a main data set to make governance <strong>and</strong> accountability possible.<br />

Besides general information such as name, number, department, division, owner, project manager,<br />

fixed budget <strong>and</strong> start <strong>and</strong> finish date (overall planning in quarters), there is data that presents the<br />

phase of the project, the entered changes (with changing colours compared to the previous entries) in<br />

the timetable, the available budget <strong>and</strong> the capacity requirements. The score <strong>and</strong> priority are mapped,<br />

as well as the estimated hours, at the start of the project, to assess the capacity possibilities within the<br />

department, within the programs <strong>and</strong> within the departments of centralized corporate groups, of the<br />

functional application administrators <strong>and</strong> of the technical application managers. They all create their<br />

own detailed plans on the basis of a corporate-wide project portfolio <strong>and</strong> therefore, the capacity for<br />

projects can be checked. When a project changes the planning of time <strong>and</strong> capacity, it is the task of<br />

the project leader to adapt the planning <strong>and</strong> to send a progress report to the PPM officer <strong>and</strong> the<br />

commissioner of the project. In order to rate the quality of this governance method, the criteria, use of<br />

275

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!