27.06.2013 Views

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 3: Goodness of fit indices<br />

Mohammad Abooyee Ardakan, Babak Sohrabi <strong>and</strong> Vahid Saadat<br />

Item Value in Model Desired Value<br />

Total number of items 39<br />

X 2 237<br />

df 86<br />

X 2 /df 2.76 0.9<br />

AGFI 0.78 >0.8<br />

St<strong>and</strong>ardized RMR 0.00 0.9<br />

CFI 0.94 >0.9<br />

5. Discussion <strong>and</strong> conclusion<br />

This paper has examined IT projects risks <strong>and</strong> Managers' IT Competency in the literature <strong>and</strong> in a<br />

study of IT projects in Tehran Municipal (Iran). This study has attempted a broad-based theoretically<br />

guided field study of how Project Performance is affected by managers' IT Competency <strong>and</strong> projects<br />

Risk Exposure. IT Competent Managers are introducing with risks <strong>and</strong> can identify them <strong>and</strong> try to<br />

manage them.<br />

These overall conclusions are reached:<br />

First, Results showed that there is a significant relation between Technology literacy of managers <strong>and</strong><br />

the risk of Technology Newness. Also, managers with great Abilities in management can overcome<br />

the risks of Application Complexity <strong>and</strong> Organizational Environment.<br />

Second, Access to <strong>Knowledge</strong> factor was the interesting one, there are some managers that can<br />

provide desired knowledge from others or knowledge resources. Ability to search <strong>and</strong> find the proper<br />

information <strong>and</strong> change them to knowledge is a great factor for managers that help them take better<br />

decisions <strong>and</strong> manage risks.<br />

Third, In general this research showed that in Tehran Municipality, high-risk IT projects with Budget<br />

criterion needs high knowledge of <strong>Management</strong> <strong>and</strong> System Development <strong>and</strong> high Experience of IT<br />

<strong>Management</strong>.<br />

Forth, High-risk IT projects with Quality criterion needs high knowledge of <strong>Management</strong> <strong>and</strong><br />

Technology <strong>and</strong> high Experience in Projects.<br />

This research also measured IT Competency of Tehran Municipality Managers <strong>and</strong> sent some<br />

valuable points to Human Resource Department for recruitment <strong>and</strong> job promotion strategies.<br />

6. Further research<br />

This research was done in Tehran Municipality. Mayor of Tehran, Dr. Mohammad Bagher Ghalibaf is<br />

very supportive to IT projects for urban development in Tehran. Tehran's IT Master Plan has been<br />

prepared by an expert team of managers <strong>and</strong> consultants <strong>and</strong> is followed by subordinates, so its IT<br />

projects will not be the good sample of IT projects in Iran. It is recommended to implement this<br />

research in some other organizations like public organizations or other municipalities of Iranian cities.<br />

Also we used instruments that were constructed before by Barki et al (2001) <strong>and</strong> Bassellier et al<br />

(2003), it seems that these instruments should be developed <strong>using</strong> some new theoretical perspective<br />

toward success/failure of IT projects regarding specific context of Iranian organizations.<br />

Acknowledgement<br />

The authors sincerely wish to acknowledge supports of Tehran Municipality in all steps of the<br />

research.<br />

References<br />

Alter, S. <strong>and</strong> Ginzberg, M. (1978) "Managing uncertainty in MIS implementation", Journal of Sloan <strong>Management</strong><br />

Review, Vol. 20, No. 1, pp. 23-31.<br />

Barki, H., Rivard, S. <strong>and</strong> Talbot, J. (2001) "An integrative contingency model of software project risk<br />

management", Journal of <strong>Management</strong> <strong>Information</strong> Systems, Vol. 17, No. 4, Spring, pp 37-69.<br />

51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!