Bartosz Wachnik<br />

3. Criteria of ERP selection <strong>and</strong> implementation partner selection<br />

A key condition of the ERP implementation in “Life&Science” enterprises is their obligatory validation.<br />

This requirement directly determines:<br />

Criteria of ERP system selection.<br />

Criteria of implementation partner selection.<br />

Selecting an ERP system that is going to be implemented <strong>and</strong> then validated as well as selecting an<br />

implementation partner has to be treated as a separate organisational project preceding an ERP<br />

system implementation. It is far more complicated <strong>and</strong> laborious than for parallel projects in other<br />

branches. Numerous ERP system presentations, referential visits <strong>and</strong> interviews with consultants that<br />

will take part in the project or even preliminary functional analyses aimed at identifying a detailed<br />

scope of the project are common practice in ERP system selection. In the „Life&Science” branch<br />

selecting a final partner responsible for an ERP system implementation <strong>and</strong> validation preparation is<br />

often preceded by an additional auditing of the partner’s enterprise. It is recommended by IT system<br />

implementation methodics in the „Life&Science” branch enterprises known as GAMP 4.0. An audit is<br />

aimed at confirming a supplier’s information concerning the project’s implementation methodics,<br />

project group’s competence, potential <strong>and</strong> means of ensuring quality. The audit’s report is the basis of<br />

running a risk analysis for selecting a specific supplier. The table no. 1 presents important ERP<br />

system selection criteria <strong>and</strong> implementation partner selection criteria. While selecting ERP software<br />

we should pay close attention to the verification of system’s functionalities that will be subject to<br />

validation. St<strong>and</strong>ard ERP systems are often increasingly supplemented with additional functionalities<br />

dedicated to the “Life&Science” branch, the so-called vertical solutions. These solutions are designed<br />

by ERP software producers or software companies that closely cooperate with ERP software<br />

producers. Selection of an ERP system for a “Life&Science” branch enterprise will give us two<br />

alternatives: either adapting a st<strong>and</strong>ard ERP system that aligns with our client’s functional<br />

requirement or purchasing a st<strong>and</strong>ard ERP system inclusive of a vertical solution designed for the<br />

„Life&Science” branch. We need to underline that both types of solutions are attractive to the<br />

„Life&Science” branch enterprises <strong>and</strong> correspond to their needs.<br />

4. Methodics of ERP Implementation<br />

Implementing an integrated ERP class system is a complicated project. As far as the level of<br />

complexity, implementation period <strong>and</strong> financial budget are concerned, it is one of the biggest IT<br />

investments for an enterprise. The ERP system implementation period in an SME productive<br />

enterprise from the “Life&Science” branch employing 200 – 300 people differs between 8 <strong>and</strong> 18<br />

months. This type of project usually requires employing about 3-4 consultants <strong>and</strong> programmers by<br />

the implementation partner <strong>and</strong> parallel number of key system users by an implementing enterprise.<br />

In Pol<strong>and</strong>, this type of project is realised on the basis of fixed budgets. In Europe <strong>and</strong> USA this type of<br />

project is implemented on basis of flexible budgets adjusted to changing project requirements. The<br />

cost of ERP system implementation in the “Life&Science” branch is usually higher than parallel<br />

implementation project in the other branches. Every producer offering their ERP system recommends<br />

defined methodics, e.g. SureStep methodics for Dynamics Nav or Dynamics AX systems offered by<br />

Microsoft or ASAP methodics for SAP system. In ERP system implementation project, apart from<br />

methodics recommended by different producers, we can distinguish the following tasks: opening<br />

meeting, often called implementation planning session, technological project, key users’ training<br />

within ERP system functionality range, functional analysis, system parameterising <strong>and</strong> programming,<br />

preliminary tests <strong>and</strong> system tuning, data migration, designing user manual <strong>and</strong> project<br />

documentation, acceptance tests, training final users, system launching <strong>and</strong> post-implementation<br />

support. It needs to be stressed that implementing an ERP system is first of all an organisational<br />

project, not an IT project. Since this decision has a strategic importance for an enterprise, it requires<br />

self-evaluation, analysis <strong>and</strong> thorough change of business processes. St<strong>and</strong>ard methodics provided<br />

by an ERP producer are not designed for specific requirements of the “Life&Science” branch<br />

enterprises. The GAMP manual presents an IT system life cycle in reference to its validation used in<br />

the “Life&Science“ branch enterprises. The “V” model is a st<strong>and</strong>ard process model (ISPE).<br />