27.06.2013 Views

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Shabnam Pas<strong>and</strong>ide, Abbas Toloie Eshlaghi, <strong>and</strong> Reza Radfar<br />

criteria along with that of 20 main-criteria, which are evaluated by the group of experts, indicated in<br />

Table 6, constitutes the final weights of the main- criteria <strong>and</strong> is listed in Table 7.<br />

<strong>Information</strong> technology criteria in the IT unit of each organization, (Alternatives= A1, A2), have been<br />

evaluated by four experts of that organization (Pi; i=1, 2, 3, 4) <strong>and</strong> the evaluations are listed in Table<br />

8. Also, the linguistic terms with the contribution of Table 2 are converted into the fuzzy values <strong>and</strong> by<br />

means of agrouping technique are aggregated then in next step by <strong>using</strong> equation (1) they are<br />

transformed into the 20 values for the main- criteria. The result is shown in table 9. Moreover,<br />

considering the defined models the level of organization’s IT have been ranked.<br />

Table 7: Evaluating main <strong>and</strong> sub-criteria weights<br />

Criteria Fuzzy Weight Criteria Fuzzy Weight<br />

C1 0.7837 0.9281 0.9843 C11 0.6811 0.8621 0.9568<br />

C2 0.6895 0.8628 0.9663 C12 0.6053 0.7573 0.8680<br />

C3 0.6085 0.6956 0.7518 C13 0.2240 0.3826 0.4967<br />

C4 0.3954 0.5028 0.5690 C14 0.4901 0.6596 0.7616<br />

C5 0.6049 0.7994 0.9305 C15 0.7947 0.8661 0.8911<br />

C6 0.7745 0.8704 0.9136 C16 0.7058 0.8009 0.8610<br />

C7 0.7225 0.8059 0.8502 C17 0.4378 0.6540 0.8365<br />

C8 0.4019 0.5314 0.6290 C18 0.6525 0.7656 0.8468<br />

C9 0.7494 0.9126 0.9861 C19 0.7547 0.9212 0.9921<br />

C10 0.7758 0.8020 0.8273 C20 0.7013 0.7263 0.7506<br />

Table 8: Linguistic terms for evaluating the IT units<br />

A1 A2<br />

C P1 P2 P3 P4 P1 P2 P3 P4<br />

C1 VL VL VL VL M MH M M<br />

C2 VH MH H MH H H H H<br />

C3 VH H MH H H H H H<br />

C4 ML L ML VL M MH M MH<br />

C5 VL VL VL VL H VH H MH<br />

C6 VH H H H H H H H<br />

C7 M M M M M MH M M<br />

C8 VL L VL L H MH H H<br />

C9 VL VL L VL M M M M<br />

C10 50 50 50 50 50 50 50 50<br />

C11 55 55 55 55 50 50 50 50<br />

C12 90 90 90 90 75 75 75 75<br />

C13 65 65 65 65 55 55 55 55<br />

C14 H H H H M M M M<br />

C15 H H H H M M M M<br />

C16 VL VL L L M M M M<br />

C17 L L L ML H VH H H<br />

C18 VL L VL L M M M M<br />

C19 L L ML L M MH M M<br />

C20 VL L VL L M MH H MH<br />

C21 VL L L VL H MH M M<br />

C22 VL VL VL VL H MH H MH<br />

C23 VL ML L L H MH H H<br />

C24 L ML L L H VH MH H<br />

C25 MH H MH M M M M M<br />

C26 M M M M M VH M M<br />

C27 M M M M M MH M M<br />

C28 0 0 0 0 M M M M<br />

C29 0 0 0 0 L ML L L<br />

C30 0 0 0 0 H H H MH<br />

C31 M M M M M VH M M<br />

C32 0 0 0 0 H H H H<br />

C33 ML M ML M M M M M<br />

C34 M M MH M L ML L ML<br />

400

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!