Tasks in an ERP<br />

implementation project<br />

Steps according<br />

to the V model<br />

System acceptance test. Operating<br />

Qualification<br />

Training final users. Propagation of<br />

awareness<br />

concerning the<br />

used tools<br />

amongst the<br />

employees.<br />

System launching System validation<br />

<strong>and</strong> launching<br />

Post-implementation<br />

support<br />

System acceptance test Performance<br />

Qualification<br />

Bartosz Wachnik<br />

Comments<br />

<strong>and</strong> emergency procedures.<br />

Correct installation of system software <strong>and</strong> application<br />

software cooperating with ERP.<br />

Software license, installation versions, back-up copies.<br />

Power supply protection for critical devices cooperating<br />

with ERP. Any possible errors detected on the<br />

qualification stage should be corrected.<br />

Operating qualification is aimed at verifying a configured<br />

ERP system in regard to requirements included in<br />

functional specification. This task requires completion of<br />

acceptance tests <strong>and</strong> completed documentation’s<br />

verification within the range of:<br />

Operating business processes in ERP system.<br />

Flow of documents in ERP system.<br />

Precision of calculations <strong>and</strong> algorithms for threshold<br />

detection <strong>and</strong> event detection<br />

Generating reports <strong>and</strong> printouts/ hard copies.<br />

Access to data records, modifications <strong>and</strong> copies in ERP<br />

system.<br />

Data transferred to other computerised systems.<br />

Work logs <strong>and</strong> system logs (audit trail)<br />

Any possible errors detected on the qualification stage<br />

should be corrected.<br />

Training end users can be undertaken by the<br />

implementation partner or by key users from the<br />

implementing company. Trainings are aimed at<br />

transferring practical knowledge concerning system’s<br />

functioning.<br />

A system has to be validated before being put into<br />

operation. Validation report should be compiled after<br />

completion of all the testes included in the validation plan.<br />

The decision to launch a system should be preceded by a<br />

risk analysis for the system put into operation. The safety<br />

of clients <strong>using</strong> our products has a superior value. Risk<br />

analysis can indicate in what technological <strong>and</strong> functional<br />

areas system failure may occur. Risk analysis is based on<br />

tests results, opinions of key users from specific<br />

departments <strong>and</strong> opinions of independent experts. On the<br />

basis of this prepared risk analysis report <strong>and</strong> validation<br />

report we can prepare a report approving a system for<br />

operation in productive environment.<br />

System usage After validation completion, an ERP system starts the<br />

phase of exploitation. In case of ERP systems it usually<br />

lasts for about 4-6 years <strong>and</strong> system functions without any<br />

significant upgrade. The GAMP manual recommends<br />

procedures that enhance a system’s stability <strong>and</strong><br />

development. Creating such procedures is a responsibility<br />

of an ERP system user.<br />

Performance qualification is aimed at verifying if an ERP<br />

system functions steadily, in accordance with approved<br />

specifications <strong>and</strong> procedures. Processing qualification is<br />

completed at a defined time after formal launching of an<br />

ERP system.<br />

In the course of an ERP system validation we gain knowledge on the solution under construction both<br />

in the IT, organisational <strong>and</strong> functional context. This knowledge is formally compiled in detailed<br />

validation reports. The following documentation should be completed in the course of ERP system<br />

validation (Rodriguez J. 2003):<br />

Documentation concerning ERP system selection.<br />

Documentation concerning implementation partner selection.<br />

Documentation concerning URS, FS <strong>and</strong> DS completion.<br />