27.06.2013 Views

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

Information and Knowledge Management using ArcGIS ModelBuilder

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Shabnam Pas<strong>and</strong>ide, Abbas Toloie Eshlaghi, <strong>and</strong> Reza Radfar<br />

Table 3: Framework of criteria <strong>and</strong> related sub criteria<br />

factors criteria Sub-criteria<br />

IT<br />

strategy<br />

IT<br />

Resource<br />

IT<br />

Use<br />

IT<br />

Performance<br />

4. Numerical example<br />

Policy -ISP contents<br />

Organization Vision<br />

Appropriateness of implementation Plan<br />

Organization chart CIO<br />

Authority, Skill<br />

IT committee<br />

Establishment<br />

Viewpoint - president’s IT sight<br />

- CIO’s IT mind<br />

Investment IT Budget<br />

Rate of Investment(ROI)<br />

Infrastructure Network # LAN port/# total employee<br />

Hardware # PC/# total employee(#TE)<br />

#PC connected to LAN/#TE<br />

Software #installed Software/#PC<br />

Security #Virus vaccine SW/#PC<br />

Backup <strong>and</strong> Recovery<br />

facility Computer training centres<br />

Conference facility<br />

Human resource IT department #Division related<br />

Human<br />

#Individuals qualified <strong>and</strong> certified<br />

resource<br />

IT operation #Guidelines<br />

Helpdesk operation<br />

IT training #Training courses /#TE<br />

#Training/#IT resource<br />

PC PC use skill<br />

Internet Mean internet use time/day<br />

#Active Email ID/#TE<br />

Intranet #Electronic document/#total doc<br />

Internet usage<br />

<strong>Information</strong>/data sharing<br />

Functions of intranet(paperless system)<br />

User satisfaction Business Process improvement<br />

IS satisfaction<br />

Motivation<br />

Web Site Contents, <strong>Information</strong>, Interface<br />

Accessibility, design<br />

Public service<br />

Responsibility, transparency<br />

IT project #IT project(SI project)<br />

Amount of funds to IT company<br />

IT Event # IT Training for citizen<br />

# Various IT event<br />

In this section, the proposed model, in two different organizations, is applied <strong>and</strong> the simulations were<br />

carried out in MATLAB (R2008) On a Pentium IV, 2 GB RAM processor.<br />

Table 4: Importance weight for evaluating 38 sub-criteria<br />

Sub-Criteria Importance-weight<br />

C1 0.8002 0.9311 0.9791<br />

C2 0.7114 0.8670 0.9587<br />

C3 0.6598 0.8401 0.9587<br />

C4 0.6067 0.8021 0.9487<br />

C5 0.4288 0.6700 0.8435<br />

C6 0.6015 0.7905 0.9387<br />

C7 0.5964 0.7791 0.9289<br />

C8 0.5720 0.7740 0.9387<br />

C9 0.8202 0.8831 0.9345<br />

C10 0.5876 0.6431 0.6944<br />

C11 0.5805 0.6466 0.7067<br />

398

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!