17.08.2013 Views

B - Ardiehl.de

B - Ardiehl.de

B - Ardiehl.de

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HYDROSTATIC PUMP (Cont’d)<br />

Assembly (Cont’d)<br />

Apply oil to the gui<strong>de</strong> and swashplate. Install the gui<strong>de</strong><br />

onto the swashplate with the gui<strong>de</strong> offset positioned to<br />

provi<strong>de</strong> clearance for the journal bearing [A].<br />

Install the swashplate into the housing [B].<br />

Adjust the swashplate so that the gui<strong>de</strong> engages the<br />

piston.<br />

Center the rotating group and swashplate over the needle<br />

bearing.<br />

Check that the spherical washer is on top of the three<br />

pins.<br />

Apply oil to the bearing and shaft. Install the shaft and<br />

bearing assembly into the end housing [C].<br />

Install the snap ring [D].<br />

–3–52–<br />

A<br />

B<br />

C<br />

D<br />

CD–00099<br />

CD–00072<br />

CD–00089<br />

CD–00088<br />

853, 853H BICS Loa<strong>de</strong>r<br />

Service Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!