Follow this<br />

procedure to order<br />

facility signs:<br />

Step 1: Complete a <strong>GE</strong> facility sign survey.*<br />

Conducted by an authorized consultant familiar<br />

with the <strong>GE</strong> sign standards, the sign survey<br />

provides you with an objective evaluation of your<br />

sign needs and gives you the opportunity<br />

to eliminate unnecessary or redundant signs.<br />

In addition, to maintain good visibility, the<br />

survey advises on the optimum size, location,<br />

and facing of all identification signs. It can also<br />

help you determine whether any existing sign<br />

structures can be retrofitted with new sign faces.<br />

The <strong>GE</strong> facility sign survey is available for any<br />

<strong>GE</strong> facility or location in the continental United<br />

States for a fixed fee (inclusive of time, travel,<br />

and out-of-pocket expenses) and includes<br />

•meeting with appropriate personnel on site to<br />

review the <strong>GE</strong> sign system and its adaptation to<br />

the location/facility<br />

• photographs of current signs and traffic<br />

approaches, with two sets of photographs submitted<br />

with the sign survey recommendation<br />

•preliminary review of all local codes regarding<br />

sign height, size, and setback requirements;<br />

all recommendations based on these restrictions<br />

•a recommendation for primary and secondary<br />

identity signs, with the survey photographs and<br />

a preliminary site plan showing sign locations<br />

• cost estimate for the sign conversion with a list<br />

of approved sign manufacturers who can bid<br />

on the project<br />

•follow-up with the sign manufacturer to confirm<br />

the understanding of the design package and<br />

specifications (following the contract award,<br />

which is the sole responsibility of the <strong>GE</strong> component<br />

or affiliate)<br />

How to Order Facility Signs 280.50<br />

Concurrently with the <strong>GE</strong> facility sign survey,<br />

you may want the sign consultant to survey for<br />

directional and safety signs. For an additional<br />

fee, the following services are available:<br />

• sign survey for directional and safety signs<br />

• detailed site plan for all primary, secondary, and<br />

directional signs<br />

• message layout for directional signs<br />

• bid package specifications for all signs<br />

• sign permit applications<br />

• shop drawing review<br />

•inspection of manufacturing and installation<br />

To arrange for a sign survey, contact<br />

Sign Management Consultants<br />

Three Lakeview Place, 25 Century Blvd., Ste. 410<br />

Nashville, TN 37214<br />

615 885-1661<br />

Step 2: Select signs.<br />

Based on survey recommendations, choose the<br />

signs to be manufactured and installed.<br />

Step 3: Bid the sign manufacture and installation.<br />

Select from the a list of sign fabricators provided<br />

as part of the sign survey or choose your own<br />

fabricator. Any sign fabricator may be selected to<br />

manufacture <strong>GE</strong> facility signs.<br />

Step 4: Award the sign contract.<br />

Generally, the selected manufacturer assumes<br />

responsibility for<br />

• removing all old signs<br />

•manufacturing new signs or elements to retrofit<br />

existing signs<br />

• installing all new signs<br />

• subcontracting any specialty services (such as site<br />

wiring, provided by an electrician) as required<br />

Note: To order decals, see page 20.<br />

<strong>GE</strong> Identity Program 280, Facility Signs <strong>GE</strong> Identity Website: www.ge.com/identity<br />

* • All <strong>GE</strong> facility sign surveys<br />

will be completed within<br />

45 days of receipt of order.<br />

• Purchase orders should<br />

accompany written confirmation<br />

of sign survey orders.<br />

• Invoices will be submitted<br />

on completion of surveys<br />

and are payable in full<br />

immediately on receipt.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!