11.07.2015 Views

transport of dangerous goods and risk management - Kirilo Savić

transport of dangerous goods and risk management - Kirilo Savić

transport of dangerous goods and risk management - Kirilo Savić

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Agreement with contractors orequipment forRemovalDisposalМ.З.Hazardous waste:explosive properties harmful propertiesflammable properties toxic propertiesoxidizing properties carcinogenic propertiesirritating properties corrosive propertiesMODEL FOR PORT WASTE MANAGEMENTDatabase for regulationsEuropean CommissionDatabase <strong>of</strong> vessels- pollutersDatabase “Navigation Pollution”Connection with center (Agency)notifies port/ terminal on thearrival <strong>of</strong> waste reception shipWaste Management Plan forevery port/ terminalCreated by MCA(Agency)Local community plan forship waste <strong>management</strong>Arrangement for ship wastedisposalDirective 2000/59/ЕСDirective 91/689/ЕЕСEquipment in port for shipwaste <strong>and</strong> cargo residuesreceptionHazardous Waste DirectiveDatabase – information <strong>of</strong> surveys (<strong>and</strong>consultations) results for users <strong>of</strong> services,port terminal operators, (leaders) (letters,questionnaires, contact with ship agents, localmunicipalities’ representatives)Part <strong>of</strong> the Ship WasteManagement PlanIn accordance with medicalservice in the portRevised by local PortAuthorityUnified WANDAsymbols for variouswaste typesMARPOL 73/78International Conventionalon the Prevention <strong>of</strong>Pollution from shipsMARPOL Annex IVFor waste reception <strong>and</strong>treatmentGreat Britain regulationsAnimal Hralth By Product SRegulations (EC/1774/2002)Plant Health (forestry/greatBritain) Other 1993On <strong>risk</strong> due to woodenmaterial for <strong>goods</strong> packingEquipment required for watermen:International framework onfor storage <strong>of</strong> all types <strong>and</strong> quantities <strong>of</strong> wastesolving the ship pollutionfor special requests <strong>of</strong> watermenproblemLegal provision: ...“adequate reception <strong>of</strong> typeInformation for every port/ terminal:<strong>and</strong> quantities <strong>of</strong> shipquantities <strong>of</strong> every type <strong>of</strong> waste actually beinghazardous waste attaken over by the terminalterminal upon notificationquantities <strong>of</strong> every type <strong>of</strong> waste that shouldfrom the ship…”be receivedquantities <strong>of</strong> every type <strong>of</strong> waste stored on theship for waste reception in other ports/terminalsWaters from slop tanksFecal wastewaterwashingShip cargo residuesDangerous wasteHazardous wasteWaters from washing oilytanksDangerous liquidsubstances <strong>of</strong> A, B or CcategoryGarbage from foodstuffShip-generated wasteMedical wasteMinimum equipment for thesubstancesprotection <strong>of</strong> workers-Litter (food garbage,plastics, etc.)-oils (sludge, ballast waters,oily waters, etc.)Conditions:-oil mixtures (alsoMinimum impact on localcontaining chemicals)municipalities-limescaleMinimum <strong>risk</strong> <strong>of</strong> waste entering-sludge from purification <strong>of</strong>the watersship sludgeSuitable for users, compactors<strong>and</strong> vesselsMinimum 30% <strong>of</strong> the total pricePrice <strong>of</strong> services:Quantity <strong>of</strong> the waste included is calculatedprice <strong>of</strong> waste receptiondepending on the users’ requirements for equipment waste treatmentdisposal <strong>of</strong> total wastethe ship type, size <strong>and</strong> categoryare taken into considerationCriteria (for a new terminal)expected amount <strong>of</strong> trafficplanned facilities for treatment atacceptable distanceexperience with similar equipmentMaximum expected quantities <strong>of</strong>wastesWaste Management PreliminaryPlanVerificationFinal Management PlanEvaluation <strong>of</strong> economicjustificationThe location <strong>of</strong> equipment (fixed<strong>and</strong> mobile) clearly marked on themapClearly marked pathway <strong>of</strong> waste(which type <strong>of</strong> waste is sent towhich plant)Equipment for treatment in theport only if it is cost-effective (orcontract with contractors)Evaluation <strong>of</strong>equipmentrequirementsFixed equipmentMobile equipment; barges, road<strong>and</strong> rail tanks <strong>and</strong> waste receptionboatsDiagram <strong>of</strong> financing the use <strong>of</strong>waste, substances, grease <strong>and</strong> oilfrom ship exploitationUnified vessel equipment forwaste receptionPreparedness <strong>of</strong>terminal to complywith the requests <strong>of</strong>national <strong>and</strong>(Marine Note)internationalMGN 253 <strong>and</strong> MGN 259regulationsEquipment at terminalEquipment for:oily waste reception<strong>dangerous</strong> liquidControl Register <strong>of</strong> oils on shipssubstances receptiontanks washingslops washingJoint plans <strong>of</strong> several terminals orports for creation <strong>of</strong> local WasteManagement Plans (provided thatthey do not violate existingPlan for Wasteregulations)Management inthe PortInformation for all users <strong>of</strong> terminal (incorporated inthe Plan)(1) Short description <strong>of</strong> essential significance <strong>of</strong>proper delivery <strong>of</strong> specified wastes(2) Diagram <strong>of</strong> locations with waste receptionequipment(3) List <strong>of</strong> the usually disposed specified wastes(4)List <strong>of</strong> contact points, operators <strong>and</strong> services(available)(5) Description <strong>of</strong> waste delivery procedures(collection <strong>and</strong> treatment <strong>of</strong> solid <strong>and</strong> liquid waste)(6) Description <strong>of</strong> discharge systems(7) Procedures for reporting the malfunction <strong>of</strong> thewaste reception facilitiesThe periodPlan revisionElements <strong>of</strong> the Planchanges asevery 3 yearsneeded(1) Assessment <strong>of</strong> requirement for waste receptionequipment with the aim <strong>of</strong> regular functioning in theterminal or port(2) Description <strong>of</strong> type <strong>and</strong> the capacity <strong>of</strong> the wastereception facility(3) Detailed description <strong>of</strong> procedures for collection <strong>and</strong>disposal <strong>of</strong> specified waste types(4) Description <strong>of</strong> system for waste discharge(5) Procedures for reporting malfunction (errors) <strong>of</strong> thewaste reception facility(6)Procedures for current consultations with the terminalpersonnel, contracting parties for waste h<strong>and</strong>ling <strong>and</strong> withother concerned parties(7) Types <strong>and</strong> quantities <strong>of</strong> the specified wastes (received<strong>and</strong> treated)(8) Overview <strong>of</strong> the relevant rules/ regulations <strong>and</strong>formalities for waste delivery(9) Identification <strong>of</strong> persons in charge <strong>of</strong> WasteManagement Plan implementation(10) Description <strong>of</strong> equipment for waste pre-treatment;processes in port or terminal if any(11) Description <strong>of</strong> methods for evaluation (monitoring) <strong>of</strong>actual degree <strong>of</strong> waste reception facility utilization(12) Description <strong>of</strong> methods for monitoring the quantities <strong>of</strong>received wasteEcological steps for:-design-equipment or-operations-vessel garbage quantities(8) Facility inspection (inspectors from ministries <strong>and</strong>agencies)(9) Information forwarded to agencies (MCA)(13) Description <strong>of</strong> the method for disposal <strong>of</strong> the specifiedwaste typesIssuance <strong>of</strong> licenses for waste recycling <strong>and</strong> treatment12. Information that ship sends prior toentering the port:- list containing the data in accordancewith Directive 2000/59/EC requests-report on the equipment for IMO (price,category <strong>and</strong> type <strong>of</strong> equipment –display in form <strong>of</strong> table)(10) Information for IMO (type, capacity <strong>and</strong>registration)(11) Description <strong>of</strong> procedures for: reduction, re-use<strong>and</strong> recycling <strong>of</strong> waste, composting, energygeneration(14) Organization <strong>of</strong> the collecting the ship cargo residues<strong>and</strong> waters for cargo space <strong>and</strong> tanks washing(15) List <strong>of</strong> limit sizes for ship purification devicesFigure 8. Original Algorithm <strong>of</strong> Activities Related to Creation <strong>of</strong> Plan for Management <strong>of</strong> Ship Waste in the Port Area 16 (M. Vukic)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!