27 February 2007 - Ordinary Meeting of Council (pdf. 14MB)
27 February 2007 - Ordinary Meeting of Council (pdf. 14MB)
27 February 2007 - Ordinary Meeting of Council (pdf. 14MB)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Ordinary</strong> <strong>Meeting</strong> <strong>of</strong> <strong>Council</strong> - <strong>27</strong> <strong>February</strong> <strong>2007</strong> 9 / 3<br />
Item 9<br />
DA1523/03-2<br />
19 <strong>February</strong> <strong>2007</strong><br />
LD2678 and LD<strong>27</strong>78, the easements were created for the purpose <strong>of</strong> conveying and carrying <strong>of</strong>f<br />
surface and stormwater only from Ontario Avenue. The terms <strong>of</strong> easement do not allow for the<br />
connection <strong>of</strong> stormwater by the applicant.<br />
Proposal<br />
The applicant proposes to connect to <strong>Council</strong>’s easement with an interlotment drain along the rear<br />
boundary <strong>of</strong> No 2 Ontario as shown in Attachment B. An interlotment easement is proposed over<br />
the pipeline along the rear boundary <strong>of</strong> No 2 Ontario Avenue.<br />
Extinguishment and creation <strong>of</strong> new easement to drain water<br />
The deferred commencement conditions required that the existing easements indicated by LD1588;<br />
LD2678 and LD<strong>27</strong>78 be amended to grant legal benefit for the property to discharge stormwater<br />
into the system. The applicant has submitted documentary evidence <strong>of</strong> owners consent to amend<br />
the existing terms <strong>of</strong> drainage easement.<br />
Of mutual benefit to <strong>Council</strong> and the applicant is a requirement to extinguish the existing easement<br />
over 6, 8 and 10 Thomas Avenue and create a new easement 1.83m wide pursuant to Section 88B<br />
<strong>of</strong> the Conveyancing Act 1919.<br />
Assessment <strong>of</strong> proposed stormwater drainage<br />
Based on the submitted plan and the hydraulic consultant’s report, the proposed alteration to the<br />
existing stormwater system is considered satisfactory.<br />
CONSULTATION<br />
<strong>Council</strong> has consulted with the Solicitor Fox and Staniland acting on behalf <strong>of</strong> the applicant in<br />
relation to the evidence and requirements to obtain the interlotment easement through No 2 Ontario<br />
Avenue which permits the connection <strong>of</strong> run<strong>of</strong>f from the subject property to <strong>Council</strong>’s underground<br />
pipe.<br />
FINANCIAL CONSIDERATIONS<br />
All cost associated with legal matters for the alteration <strong>of</strong> terms <strong>of</strong> drainage easement are to be<br />
borne by the applicants, who benefit from this work.<br />
CONSULTATION WITH OTHER COUNCIL DEPARTMENTS<br />
Technical Services has consulted with the Engineering Assessment Unit in Development and<br />
Regulatory in matters relating to the flood study and overland flows over the subject property.<br />
N:\0702<strong>27</strong>-OMC-SR-03649-4 ONTARIO AVENUE ROSEVILL.doc/etan /3