23.03.2014 Views

27 February 2007 - Ordinary Meeting of Council (pdf. 14MB)

27 February 2007 - Ordinary Meeting of Council (pdf. 14MB)

27 February 2007 - Ordinary Meeting of Council (pdf. 14MB)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Ordinary</strong> <strong>Meeting</strong> <strong>of</strong> <strong>Council</strong> - <strong>27</strong> <strong>February</strong> <strong>2007</strong> 2 / 41<br />

20 to 22 Tryon Road, Lindfield<br />

Item 2<br />

DA0826/06<br />

22 January <strong>2007</strong><br />

77. The following tree species shall be planted, at no cost to <strong>Council</strong>, in the nature strip fronting<br />

the property along Tryon Road as an evenly spaced avenue planting. The tree/s used shall be<br />

a minimum 25 litres container size specimen/s trees:<br />

Tree Species<br />

Quantity<br />

Lophostemon confertus (Brushbox) 3<br />

78. The following tree species shall be planted, at no cost to <strong>Council</strong>, in the nature strip fronting<br />

the property along Tryon Road as an evenly spaced avenue planting. The tree/s used shall be<br />

a minimum 25 litres container size specimen/s trees:<br />

Tree Species<br />

Quantity<br />

Lophostemon confertus (Brushbox) 5<br />

79. All builders' refuse, spoil and/or material unsuitable for use in landscape areas shall be<br />

removed from the site on completion <strong>of</strong> the building works.<br />

80. The canopy replenishment trees to be planted shall be maintained in a healthy and vigorous<br />

condition until they attain a height <strong>of</strong> 5.0 metres whereby they will be protected by <strong>Council</strong>’s<br />

Tree Preservation Order. Any <strong>of</strong> the trees found faulty, damaged, dying or dead shall be<br />

replaced with the same species.<br />

CONDITIONS TO BE COMPLIED WITH PRIOR TO THE ISSUE OF A CONSTRUCTION<br />

CERTIFICATE<br />

81. Critical Stage Inspections for Building Work (Class 2):<br />

Where applicable inspections <strong>of</strong> the development site may be required to be undertaken at the<br />

following stages:<br />

a) At the commencement <strong>of</strong> the building work; and<br />

b) Prior to covering <strong>of</strong> waterpro<strong>of</strong>ing in any wet areas, for a minimum <strong>of</strong> 10 percent <strong>of</strong><br />

rooms with wet areas within a building; and<br />

c) Prior to covering any stormwater lines/connections; and<br />

d) After the building work has been completed and prior to any occupation certificate<br />

being issued in relation to the building.<br />

e) Other inspection required by PCA<br />

Critical Stage Inspections for Building Work (Class 7):<br />

Where applicable inspections <strong>of</strong> the development site may be required to be undertaken at the<br />

following stages:<br />

a) At the commencement <strong>of</strong> the building work; and<br />

b) Prior to covering any stormwater drainage lines/connections; and<br />

c) After the building work has been completed and prior to any occupation certificate<br />

issued in relation to the building;<br />

d) Other inspection as required by the PCA.<br />

N:\0702<strong>27</strong>-OMC-PR-03642-20 TO 22 TRYON ROAD LINDF.doc/pdonnelly/41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!