11.07.2015 Views

PDF user manual for CopperEdge 150

PDF user manual for CopperEdge 150

PDF user manual for CopperEdge 150

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PORTSTATUSMONRECEIVEMONTRANSMITMODULEMODULESTATUSMODULEDS 3 FRAMEMODULE(24 PORTS)(24 PORTS)MODULENETWORKSNETWORKSNETWORKSNETWORKSNETWORKSNETWORKMODEMDIAGNOSTICCRAFTLOCALCRAFTCO PP ER MOU NTAI NCOPPEREDGE<strong>150</strong>5DFN,QVWDOODWLRQThe CE<strong>150</strong> can be installed with attachment hardware <strong>for</strong> either19-inch EIA or 23-inch Telco CO style racks. The standardconfiguration is 19-inch ears <strong>for</strong> mounting, although theCE<strong>150</strong> has rubber feet on the bottom <strong>for</strong> sitting on a table.A typical rack-mount installation is shown in the following diagram.MODULESTATUSBUFFERCONTROLCOPPERMOUNTAIN1FA R ENDNEAR ENDSYSTEMCONTROL2/313 14 15 16 17 18 19 20 21 22 23 24 ÃÃÃÃMODULESTATUS1 2 3 4 5 6 7 8 9 10 11 12 ÃÃÃSDSLMODULECOPPERMOUNTAIN413 14 15 16 17 18 19 20 21 22 23 24 ÃÃÃÃPORTSTATUS1 2 3 4 5 6 7 8 9 10 11 12 ÃÃÃSDSLMODULECOPPERMOUNTAIN5COPPERMOUNTAIN6MODULESTATUSACPOWERCOPPERMOUNTAIN7A Typical Rack Mount Installation&RSSHU(GJH,QVWDOODWLRQDQG2SHUDWLQJ*XLGH

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!