11.07.2015 Views

PDF user manual for CopperEdge 150

PDF user manual for CopperEdge 150

PDF user manual for CopperEdge 150

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3UH3RZHU&KHFNBe<strong>for</strong>e you apply power to the CE<strong>150</strong> <strong>for</strong> the first time, take afew minutes to check the physical integrity of the installed unit:• Check that the power wires match the right leads. If youare uncertain, use the voltmeter to test the circuitry.• Check that all plug-in modules are properly aligned andseated in their connectors.• Check all modules to ensure that their extraction leversare lying flat, parallel to the plane of the front panel(module inserted position).• Check the retainer screws on all plug-in modules andassemblies, including the fan tray and the alarmmodule. Use your fingers to tighten any loose screwsuntil they are snug.• Check all connectors to be sure they are correctlyinstalled and fastened securely.This completes the physical installation.&KDSWHU,QVWDOODWLRQ

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!