19.09.2016 Views

Transportation Management with SAP LES

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5<br />

Delivery Documents<br />

Example 3: Material is Completely Deliverable Later, Partial Delivery in Advance<br />

In example 3, your customer also orders 20 units; however, he wants the fastest<br />

possible delivery — partial deliveries are permitted in this case. Enter your sales<br />

order. Because it is the same initial situation as in example 2, the material is not<br />

available on the required delivery date. The system now calculates the best option<br />

based on the partial delivery flag and the earliest available quantity. The result is<br />

shown in Figure 5.84.<br />

ATP Availability Check Process, Sample Case 3<br />

Inward Movement<br />

Warehouse Stock<br />

Material Staging<br />

Order Quantity:20<br />

Delivery Date<br />

Note: Customer<br />

accepts<br />

partial deliveries<br />

Purchase<br />

Order<br />

Purchase<br />

Order<br />

100<br />

50<br />

60<br />

10<br />

10<br />

Time<br />

40<br />

50<br />

100<br />

Order<br />

Order<br />

Outward<br />

Movement<br />

Order<br />

Material Staging<br />

Confirmation Date<br />

Material Staging<br />

Confirmation Date<br />

Figure 5.84 Result of Example 3 <strong>with</strong> Newly Calculated Availability Based on Partial Deliveries<br />

Two schedule lines are generated in the sales order, each <strong>with</strong> two newly calculated,<br />

different confirmation dates. You can send the customer the materials that<br />

are available earlier as a partial delivery.<br />

Example 4: Material Available <strong>with</strong>in the Replenishment Lead Time<br />

In the previous example, you have switched on the consideration of replenishment<br />

lead times in the <strong>SAP</strong> system. You can set the replenishment lead time of<br />

your materials in the material master. This lead time depends on various factors<br />

(see Section 5.8.2). Figure 5.85 shows the results of the availability check under<br />

consideration of the replenishment lead time.<br />

170<br />

© 2014 by Galileo Press Inc., Boston (MA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!