19.09.2016 Views

Transportation Management with SAP LES

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Stages 13.2<br />

Figure 13.30 Definition of a Route Stage<br />

8. Now, I create a sales order and the delivery document (see Figure 13.31).<br />

Figure 13.31 Delivery Document <strong>with</strong> the New Route, OGDEU1<br />

9. To create the shipment document, I make my selection in relation to the new<br />

route and therefore similar delivery documents are combined in one shipment.<br />

I set the “Planning” status. The system displays the message that an automatic<br />

leg determination is not provided. That is correct, but the stage has been used<br />

from the route (see Figure 13.32).<br />

Keep an eye on the Determine legs control, “Blank,” and Adopt route, “Adopt all<br />

stages.” For example, if leg determination category “1” was activated, in addition<br />

to the direct leg for the load transfer point, a subsequent leg to the ship-to party<br />

would be generated.<br />

Personal Copy for Tina Mastrup, user id 9f19c686-d5e1-4016-94fd-ebc72e1b8f7e<br />

453

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!