19.09.2016 Views

Transportation Management with SAP LES

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sales Orders 4.1<br />

Technical Information About the Linking of Item Categories<br />

EE<br />

EE<br />

Field Length: 4 places<br />

Path in Customizing: Sales and Distribution • Sales • Sales Document • Sales<br />

Document Item • Assign Item Categories<br />

EE<br />

Specific Transaction: –<br />

EE<br />

Table: T184<br />

Subitems<br />

The subitems are special items <strong>with</strong>in the items. Subitems are assigned to a socalled<br />

superitem in the sales order document. In most cases, they are only used<br />

if free goods are granted. These free goods (also referred to as a rebate in kind)<br />

are inserted as an additional item in the document and assigned to the item that<br />

triggered the rebate. In addition, you can also use subitems for bills of material<br />

(BOM), for example, when the ordered material itself is only invoice-relevant, but<br />

the BOM items must be commissioned and delivered individually. You can also<br />

enter certain services associated <strong>with</strong> the delivered material as subitems and assign<br />

them to the material.<br />

The item categories, their assignment to the order type, and the respective process<br />

control of the subitems themselves are maintained via Customizing in the same<br />

table as other item categories.<br />

Schedule Line Categories<br />

The schedule lines are just as important as the items for the shipping process. An<br />

item in the sales order must have at least one schedule line. Schedule lines contain<br />

information on inventory management and on when (delivery date) and<br />

for how much (delivery quantity) the delivery should be made and on how the<br />

demand is transferred to materials planning. This information is required to create<br />

deliveries.<br />

Schedule lines fall into different schedule line categories. For each schedule line category,<br />

you must specify the handling of the information mentioned previously. If<br />

a physical goods issue occurs at all, the schedule line category must be set to Delivery-relevant.<br />

If it is delivery-relevant, you must specify the necessary movement<br />

type in the schedule line category. Based on the movement type, you can define<br />

Personal Copy for Tina Mastrup, user id 9f19c686-d5e1-4016-94fd-ebc72e1b8f7e<br />

71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!