19.09.2016 Views

Transportation Management with SAP LES

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4<br />

Documents<br />

You can reach the item data by marking the desired item and selecting Goto • Item<br />

• Shipping from the menu. The screen that appears contains the following data:<br />

EE<br />

EE<br />

EE<br />

EE<br />

EE<br />

EE<br />

EE<br />

EE<br />

EE<br />

Unloading Point, Receiving point, and Department<br />

Unlike the header data, at item level, you can specify your own information<br />

regarding the delivery address of the ship-to party.<br />

Delivery Prior.<br />

The delivery priority is specified in the customer master or customer material<br />

information record and copied to the standard order. If several customers order<br />

the same item at the same time and availability is not sufficient to deliver to all<br />

customers, you can use the delivery priority to control which customer has a<br />

higher priority for delivery.<br />

Plant<br />

Here you can find the delivering plant. See Section 5.5.3 for more information<br />

on the delivering plant.<br />

Stor. location<br />

When entering the standard order, you have the option to specify from which<br />

storage location the ordered items should be picked and delivered. The actual<br />

storage location determination does not take place until creation of the delivery.<br />

Shipping Point<br />

The shipping point indicates at what point in your company shipping should<br />

take place. Shipping point determination is described in Section 5.5.<br />

Route<br />

Here you can find the route. Detailed information about this is provided in Section<br />

5.6.<br />

Part.div./item<br />

If you want this item in a delivery to be delivered completely, you must set<br />

the appropriate flag, otherwise, the <strong>SAP</strong> system may split this item into several<br />

deliveries. This splitting is based on the availability of materials.<br />

Max.Part.Deliv.<br />

If you have allowed partial delivery for this item, you can specify the maximum<br />

number of partial deliveries here.<br />

Shipping type, Spec.processing, and POD-relevant<br />

Here again, in contrast to your specifications at header level, you can record<br />

80<br />

© 2014 by Galileo Press Inc., Boston (MA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!