19.09.2016 Views

Transportation Management with SAP LES

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Scheduling 6.1<br />

Technical Information About Defining the Shipping Times<br />

EE<br />

EE<br />

EE<br />

Path in Customizing: Logistics Execution • Shipping • Basic Shipping Functions •<br />

Scheduling • Delivery Scheduling and <strong>Transportation</strong> Scheduling • Define Scheduling<br />

by Shipping Point<br />

Specific Transaction: OVLZ<br />

Table: TVST<br />

Once you have decided on an option for determining the time required for picking<br />

and packing, you maintain the times accordingly in the Pick/pack wrkdys field.<br />

In my example (see Figure 6.3), I calculate the time required for picking and packing<br />

independent of the route and the weight, because shipping beverages <strong>with</strong>in<br />

Germany always uses the same time: two days (as an example for documenting<br />

scheduling). But if you need to ship your goods overseas, for example, you will<br />

have to deal <strong>with</strong> longer times for picking and packing. Route-dependent calculation<br />

of the time would be a good selection in that case.<br />

If you decided to define the time required for picking and packing for each shipping<br />

point (value “C”), a field opens in which you can enter the time in terms of<br />

the number of days (see Figure 6.3). If you decided on “A” or “B,” (weight-dependent,<br />

or route-dependent and route-independent), you must enter the times in the<br />

appropriate maintenance screen (see Figure 6.4).<br />

Figure 6.4 Maintenance Screen for Picking and Packing Times<br />

Technical Information About Defining Picking and Packing Times<br />

EE<br />

Path in Customizing: Logistics Execution • Shipping • Basic Shipping Functions •<br />

Scheduling • Delivery Scheduling and <strong>Transportation</strong> Scheduling • Maintain Duration<br />

EE<br />

Specific Transaction: –<br />

EE<br />

Table: T630R<br />

Loading Date, Loading Time, and Goods Issue Date<br />

Once you have picked, packed, and prepared all material for loading, you have<br />

reached the loading date milestone. Loading the goods can now begin.<br />

Personal Copy for Tina Mastrup, user id 9f19c686-d5e1-4016-94fd-ebc72e1b8f7e<br />

181

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!