19.09.2016 Views

Transportation Management with SAP LES

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13<br />

Other Shipment Functions<br />

have completed the loading of your materials at the second shipping point, the<br />

first ship-to party is in 88763 München (Munich), the second in 86199 Augsburg,<br />

and the last in 86343 Königsbrunn. At this point, the shipment ends.<br />

For sorting the delivery documents, move them in the overview so that you obtain<br />

the respective sequence (see Figure 13.12). You can move them by placing the cursor<br />

on the delivery document, keeping the left mouse button pressed, and dragging<br />

the document to the desired position.<br />

Figure 13.12 Overview of the Sample Delivery Documents<br />

Although <strong>SAP</strong> uses the terms stage and leg, I will always talk of stages in the<br />

examples.<br />

13.2.1 Manually Creating Stages<br />

To create stages, manually is the easiest, but also the most time-consuming way.<br />

You enter your stages manually in the shipment document and define for each<br />

stage one departure point and one destination. In the overview, go to the Stages<br />

tab. Usually, no stages are added at the beginning so that no already-existing stages<br />

will be displayed (see Figure 13.13).<br />

Figure 13.13 Overview of the Stages Tab<br />

442<br />

© 2014 by Galileo Press Inc., Boston (MA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!