12<br />

Shipment<br />

Enter the destination point for this preliminary leg shipment and press Enter.<br />

Navigate to the Stages tab to check your entries. Here, you can find both the<br />

departure point (that is, the shipping point from the delivery document) and the<br />

port of destination (see Figure 12.52).<br />

Figure 12.52 Overview of the Shipment Document After Entry of Port of Destination<br />

Save the preliminary leg shipment. In the delivery document, the transportation<br />

planning status has changed to “B” (see Figure 12.53).<br />

Figure 12.53 <strong>Transportation</strong> Planning Status after Completion of Preliminary Leg<br />

The same procedure applies for the creation of the main leg (ensure that the correct<br />

shipment type is entered). In the <strong>SAP</strong> standard, the main leg by sea is defined as<br />

the “0005” shipment type. Finally, you create the subsequent leg. Upon completion,<br />

the transportation planning status changes to “C” in the delivery document.<br />

All three shipment documents can also be created using collective processing<br />

(Transaction VT04) (see Figure 12.12). Select a selection variant and click on the<br />

426<br />

© 2014 by Galileo Press Inc., Boston (MA)