18.12.2012 Views

INTERNATIONAL OLYMPIC ACADEMY 7th JOINT - IOA

INTERNATIONAL OLYMPIC ACADEMY 7th JOINT - IOA

INTERNATIONAL OLYMPIC ACADEMY 7th JOINT - IOA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10. A project coordinator will be given the possibility to work<br />

permanently in the Olympic House.<br />

Details of the production:<br />

1. Design of a cartoon (in condition to transfer the unlimited<br />

copyright).<br />

2. Cartoon animation<br />

3. Design of the presentation slides.<br />

4. Design and programming of the interactive game architecture.<br />

5. Design of music and effect.<br />

6. Design of the production interfaces.<br />

7. The gathering of the content slides, animation, film, voice and<br />

related media with the interactive structure under a common code.<br />

8. Design and production of the game consoles.<br />

9. Design of the connection between the computer, the control panels<br />

and the game consoles.<br />

10. Preparation of the guide determining the projection, voice and<br />

computer system standards and including details of usage.<br />

Budget of the project:<br />

a) Production activities concerning the presentation = 50.000 $<br />

Beginning price<br />

Annual Revision Price = 5.000 $<br />

Software, Hardware and Physical preparations = 7.000 $<br />

Annual Revision Price = 2.000 $<br />

b) Reproduction of the printed material<br />

(questionnaire, leaflet, booklet) = 5.000 $/year<br />

c) Cost of the compere (part-time) = 20.000 $/year<br />

d) Project = 15.000 $/year<br />

Total budget for the beginning year = 97.000 $/year<br />

Total annual budget = 47.000 $/year<br />

- 152 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!