22.07.2013 Views

II - DCE FEL ČVUT v Praze

II - DCE FEL ČVUT v Praze

II - DCE FEL ČVUT v Praze

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 1-7 Safety measures<br />

Mechanical Configuration of an Automation System with SIMATIC S7 Ex Modules<br />

Working area Safety measures<br />

Installations with readily flammable<br />

gas and vapor-air mixtures, e.g.<br />

hydrogen, city gas, acetylene and<br />

hydrogen sulphide<br />

Installations with gas and vapor-air<br />

mixtures such as methane, propane,<br />

butane and petrol (gasoline)<br />

Installations with risk of explosion<br />

from readily flammable dust<br />

I/O Modules with Intrinsically-Safe Signals<br />

C79000-G7076-C152-04<br />

Working only allowed after implementation of special<br />

safety measures and with written permission of plant<br />

manager. Only non-sparking tools to be used (tool softer<br />

than workpiece).<br />

Sufficient to use non-sparking tools. Exception: For<br />

materials with rust formation and aluminum coating or<br />

similar, special protective measures required.<br />

Remove dust deposits.<br />

Keep working area wet and protect against dust formation.<br />

Normal tools may be used.<br />

Note<br />

Working on energized electrical installations and apparatus in hazardous<br />

industrial premises is prohibited. This also includes the disconnection of live<br />

control lines for test purposes.<br />

As an exception, work on intrinsically safe circuits is permitted; also, in<br />

special cases, work on other electrical systems where the user has certified in<br />

writing that there is no risk of explosion for the duration of the work at the<br />

site.<br />

If necessary, a fire permit must additionally be obtained.<br />

Grounding and short-circuiting may only be carried out in hazardous<br />

industrial premises when there is no risk of explosion at the point of<br />

grounding and short-circuiting.<br />

Use measuring instruments which are approved for the zones to test for no<br />

voltages.<br />

1-41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!