Exhibit 2<br />

Page 11 of 379<br />

Terminal 4 Gate Replacement – Western Expansion<br />

2.27 Plans or Drawings: The official graphic representations of the Project which are a part of the<br />

Contract Documents.<br />

2.28 Pricing Documents: The set of drawings <strong>and</strong> specifications upon which the GMP is<br />

negotiated as enumerated in Exhibit 5.<br />

2.29 Program Manager: The Program Management Office (PMO) is the professional organization<br />

the <strong>COUNTY</strong> has contracted to provide program management services to the Project, or<br />

such other entity designated by the <strong>COUNTY</strong>.<br />

2.30 Project: The construction of Terminal 4 Gate Replacement – Western Expansion (Project<br />

Number 3300) for <strong>COUNTY</strong> pursuant to those Contract Documents as enumerated in<br />

Exhibit (TBD)<br />

2.31 Project Initiation Date: The date upon which the Contract Time commences, as established<br />

in a Notice To Proceed.<br />

2.32 Project Manager: Employee of BCAD representing the CA on this project.<br />

2.33 Project Plan: A written description of the resources <strong>and</strong> equipment CONTRACTOR intends<br />

to use at the time of pricing, in coordination with the Baseline Schedule, to complete the<br />

Work. The plan will describe the staging of materials, placement of equipment, use of<br />

temporary utilities, <strong>and</strong> other factors necessary to allow <strong>COUNTY</strong> to maintain the Airport in<br />

operating condition.<br />

2.34 Subcontractor: A person, firm or corporation having a direct contract with CONTRACTOR<br />

including one who furnishes material worked to a special design according to the Contract<br />

Documents for this work, but does not include one who merely furnishes material not so<br />

worked.<br />

2.35 Substantial Completion: That date, as certified in writing by CPM <strong>and</strong> Consultant <strong>and</strong> as<br />

finally determined by Contract Administrator’s sole discretion, the Work, or a portion thereof,<br />

is at a level of completion in substantial compliance with the Contract Documents such that<br />

all conditions of permits <strong>and</strong> regulatory agencies have been satisfied <strong>and</strong> the <strong>COUNTY</strong> or its<br />

designee can enjoy use or occupancy <strong>and</strong> can use or operate it in all respects for its<br />

intended purpose. A Certificate of Occupancy (or a Temporary Certificate of Occupancy<br />

(TCO) or other alternate municipal/county authorization for limited or conditional occupancy<br />

acceptable to the Contract Administrator) must be issued for Substantial Completion to be<br />

achieved, however, the issuance of a Certificate of Occupancy or the date thereof are not to<br />

be determinative of the achievement or date of Substantial Completion.<br />

2.36 Surety: The company or individual which is bound by the performance bond <strong>and</strong> payment<br />

bond with <strong>and</strong> for CONTRACTOR, who is primarily liable, <strong>and</strong> which surety company or<br />

individual is responsible for CONTRACTOR's acceptable <strong>and</strong> timely performance <strong>and</strong><br />

completion of the work under the Agreement <strong>and</strong> for the payment of all debts pertaining<br />

thereto in accordance with Section 255.05, Florida Statutes.<br />

CM @ Risk Agreement R0787918R1 Page 10 of 85