01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DIVISION 1 SPECIFICATIONS<br />

SECTION 1045 CUTTING AND PATCHING<br />

Exhibit 2<br />

Page 219 of 379<br />

4. Foundation construction.<br />

5. Bearing <strong>and</strong> retaining walls.<br />

6. Structural decking.<br />

7. Exterior wall construction.<br />

8. Piping, ductwork, vessels, <strong>and</strong> equipment.<br />

9. Water, moisture, vapor, air, <strong>and</strong> smoke barriers, membranes, <strong>and</strong><br />

flashing.<br />

10. Noise <strong>and</strong> vibration control elements <strong>and</strong> systems.<br />

11. Control, communication, conveying, <strong>and</strong> electrical wiring systems.<br />

12. Primary operational systems <strong>and</strong> equipment.<br />

G. For new Work, retain original installer or fabricator, or another recognized<br />

experienced <strong>and</strong> specialized firm to perform cutting <strong>and</strong> patching.<br />

1.02 SUBMITTALS<br />

A. Procedural Proposal for Cutting <strong>and</strong> Patching:<br />

1. Where prior acceptance of cutting <strong>and</strong> patching is required, submit<br />

proposed procedures for Work well in advance of time Work will be<br />

performed.<br />

2. Including the following information, as applicable, in submittal:<br />

a. Describe nature of Work <strong>and</strong> how it is to be performed, indicating<br />

why cutting <strong>and</strong> patching cannot be avoided.<br />

b. Describe anticipated results of Work in terms of change to existing<br />

Work, including structural operational <strong>and</strong> visual changes as well<br />

as significant elements.<br />

c. List products to be used <strong>and</strong> firms that will perform Work.<br />

d. Dates when Work is expected to be performed.<br />

e. List utilities that will be disturbed or otherwise be affected by<br />

Work, including utilities that will be relocated <strong>and</strong> utilities that will<br />

be out-of-service temporarily.<br />

f. Indicate how long utility service will be disrupted.<br />

B. Review of procedural proposal by CPM does not waive CPM’s’s right to later<br />

require complete removal <strong>and</strong> replacement of Work found to be cut <strong>and</strong> patched<br />

in unsatisfactory manner.<br />

Section 01045 Cutting <strong>and</strong> Patching Page 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!