DIVISION 1 SPECIFICATIONS - SECTION 01500 TEMPORARY FACILITIES<br />

Exhibit 2<br />

Page 294 of 379<br />

PART 1 - GENERAL<br />

1.01 SUMMARY<br />

A. This Section specifies requirements for temporary services <strong>and</strong> facilities,<br />

including utilities, construction <strong>and</strong> support facilities, security <strong>and</strong> protection.<br />

B. Temporary utilities required include but are not limited to:<br />

1. Temporary electric power <strong>and</strong> light.<br />

2. Temporary telephone service.<br />

3. Temporary water service<br />

4. Temporary project identification sign; all others are prohibited.<br />

C. Temporary support facilities required include but are not limited to:<br />

1. Sanitary facilities, including drinking water.<br />

2. Waste disposal services.<br />

3. Dust control.<br />

D. Temporary construction <strong>and</strong> support facilities:<br />

1. BCAD will provide a Field office for use by the CONTRACTOR during the<br />

performance of the Work. Additional filed office requirements must be<br />

approved by the Contract Administrator prior to mobilizing temporary<br />

facilities.<br />

E. Security <strong>and</strong> protection facilities required include but are not limited to:<br />

1.02 SUBMITTALS<br />

1. Barricades, warning signs, lights,<br />

2. Enclosures <strong>and</strong> Fencing,<br />

3. Environmental protection,<br />

4. Vehicular access,<br />

5. Parking,<br />

6. Traffic Regulation, <strong>and</strong><br />

7. Security.<br />

A. Implementation <strong>and</strong> Termination Schedule: Submit a schedule indicating<br />

implementation <strong>and</strong> termination of each temporary facility or utility not less than<br />

(fifteen) 15 days of the established date for the commencement of the Work.<br />

1.03 QUALITY ASSURANCE<br />

A. Regulations: Comply with industry st<strong>and</strong>ards <strong>and</strong> applicable laws <strong>and</strong><br />

regulations of authorities having jurisdiction, including but not limited to:<br />

1. Building Code requirements,<br />

Section 01500 Temporary Facilities Page 89