D. Security - General Project Rules <strong>and</strong> Regulations<br />

Exhibit 2<br />

Page 183 of 379<br />

1. Construction Site Security<br />

Broward County will provide security service for this project. This service in no way relieves the<br />

contractors/subcontractors from contractual duties, obligations <strong>and</strong> responsibilities to ensure that<br />

their trailers, vans, vehicles, equipment, tools, gang boxes, storage areas, etc., are properly secured<br />

at the end of each working day. Project Security will maintain project ID information on each<br />

employee.<br />

2. Vehicle Search<br />

All vehicles will be subject to search upon entering <strong>and</strong> exiting the construction site. Any<br />

unauthorized vehicle parked on the project site (other than in designated parking areas) may be<br />

physically removed at the expense of the vehicle owner.<br />

3. Visitors<br />

All visitors to the project must report to Project Security prior to entering the construction site.<br />

4. Loitering On Job Site<br />

Loitering on the job site before or after the assigned shift is prohibited. If<br />

contractor’s/subcontractor’s employees violate this rule they may be barred from the project site.<br />

5. Security Checks<br />

Regular <strong>and</strong> r<strong>and</strong>om security checks will be conducted. Contractors’ or subcontractors’ employees<br />

will be required to open all packages such as lunch kits, coolers, etc., upon request. Vehicles<br />

entering or leaving the project site will be subject to inspection.<br />

E. Contractor Security Responsibilities<br />

Contractors/Subcontractors, of any tier, are responsible for administration of the site security<br />

procedures, including:<br />

1. Providing vehicle insurance certificates <strong>and</strong> proofs of ownership<br />

2. Providing a list of supervisory personnel including addresses <strong>and</strong> off duty phone numbers<br />

3. Adequately identifying tools <strong>and</strong> equipment<br />

4. Securing all tools <strong>and</strong> equipment at the end of the shift to prevent v<strong>and</strong>alism, theft or unauthorized<br />

use<br />

F. Contractors’ Employee Responsibility<br />

Everyone on the project site will comply with the following:<br />

1. Operate vehicles in a safe manner while on site<br />

2. Display proper <strong>and</strong> acceptable identification while on site<br />

February 4, 2010<br />

Rev. 001<br />

34