Exhibit 2<br />

Page 65 of 379<br />

Terminal 4 Gate Replacement – Western Expansion<br />

23.4 Failure to reject any defective work or material shall not in any way prevent later<br />

rejection when such defect is discovered, or obligate <strong>COUNTY</strong> to Final Completion.<br />

23.5 The CONTRACTOR shall, to the CA’s satisfaction, (i) replace any part of the Work that<br />

fails to conform with the requirements of this Agreement that appear during progress of<br />

the Work on the Project; or (ii) remedy any defects in the Work due to faulty materials or<br />

workmanship which appear within a period of one (1) year from the time of Substantial<br />

Completion of the Work or portions thereof hereunder or within such longer period of<br />

time as may be set forth in the Contract Documents or as may be required by law; or (iii)<br />

replace, repair or restore any parts of the Project or furniture, fixtures, equipment or<br />

other items placed therein (whether by the <strong>COUNTY</strong> or any other party) that are injured<br />

or damaged by any such parts of the Work that do not conform to the requirements of<br />

this Agreement or are due to defects in the Work. The provisions of this Article 23 shall<br />

not apply to corrective work attributable solely to the acts of omissions of any separate<br />

contractor or Subcontractor of the <strong>COUNTY</strong> unless the CONTRACTOR is acting in such<br />

capacity or capacities. The cost to the CONTRACTOR of performing any of its<br />

obligations under this Article 23 shall be within the GMP. The CONTRACTOR’s<br />

responsibility to make repairs <strong>and</strong> redo work under this Article 23, is in addition to the<br />

CONTRACTOR's responsibility to the <strong>COUNTY</strong> for any other damages of any kind for<br />

which the CONTRACTOR would be legally responsible.<br />

23.6 If the CA <strong>and</strong> the CONTRACTOR deem it inexpedient to require the correction of work<br />

damaged or not performed in accordance with the Contract Documents, an equitable<br />

deduction from the Contract Price <strong>and</strong> the GMP shall be made by agreement <strong>between</strong><br />

the CONTRACTOR <strong>and</strong> the CA, or <strong>COUNTY</strong> as appropriate Until such settlement, the<br />

CA may withhold such sums as the CA deems just <strong>and</strong> reasonable from monies, if any,<br />

due the CONTRACTOR. If no moneys are held by the <strong>COUNTY</strong>, reimbursement shall<br />

be made to the <strong>COUNTY</strong> within thirty (30) calendar days by the CONTRACTOR.<br />

23.7 The CONTRACTOR’s express warranty herein shall be in addition to, <strong>and</strong> not in lieu of,<br />

any other warranties or remedies the <strong>COUNTY</strong> may have under this Agreement, at law,<br />

or in equity for defective Work.<br />

ARTICLE 24 - SIGNAGE<br />

24.1 Any requirements for project signs shall be as set forth within the Technical<br />

Specifications section. In the absence of such technical specification, CONTRACTOR<br />

shall coordinate with <strong>and</strong> provide Contract Administrator’s typical project sign including<br />

applicable Broward County color logo graphics <strong>and</strong> identification of BOARD,<br />

CONTRACTOR, PMO, CPM, Consultant, <strong>and</strong> other personnel at the direction of the CA.<br />

24.2 All construction signage located at the Project Location, shall be subject to the prior<br />

written approval of the CPM <strong>and</strong> Contract Administrator. The CONTRACTOR recognizes<br />

that all signage may be disallowed, in the CPM’s <strong>and</strong> Contract Administrator’s sole<br />

discretion, <strong>and</strong> that existing signage or advertising on construction field offices, trailers,<br />

construction fences, <strong>and</strong> other construction elements or aids, may be required to be<br />

masked or deleted, all at no cost or expense to the <strong>COUNTY</strong>. Such signage will be<br />

CM @ Risk Agreement R0787918R1 Page 64 of 85