DIVISION 1 SPECIFICATIONS - SECTION 01500 TEMPORARY FACILITIES<br />

1. County will provide Contractor with electricity <strong>and</strong> the Contractor will<br />

provide any transformer required to convert the power to the voltage <strong>and</strong><br />

amperage necessary to conduct its Work. County will pay cost of energy<br />

used. Exercise measures to conserve energy. Utilize County’s existing<br />

power service.<br />

2. Provide temporary electric feeder from existing building electrical service<br />

at location as directed by CPM. Do not disrupt County's use of service.<br />

3. Complement existing power service capacity <strong>and</strong> characteristics as<br />

required for construction operations.<br />

4. Provide power outlets, with branch wiring <strong>and</strong> distribution boxes located<br />

at each floor, as required for construction operations. Provide flexible<br />

power cords as required for portable construction tools <strong>and</strong> equipment.<br />

5. Provide main service disconnect <strong>and</strong> over-current protection at<br />

convenient location <strong>and</strong> feeder switch at source distribution equipment.<br />

6. Permanent convenience receptacles may be utilized during construction.<br />

B. Temporary Lighting for construction purposes<br />

1. Provide <strong>and</strong> maintain lighting for construction operations to achieve<br />

minimum lighting level of 2 watt/sq ft.<br />

2. Provide <strong>and</strong> maintain 1 watt/sq ft lighting to exterior staging <strong>and</strong> storage<br />

areas after dark for security purposes.<br />

3. Provide branch wiring from power source to distribution boxes with<br />

lighting conductors, pigtails, <strong>and</strong> lamps for specified lighting levels.<br />

4. Maintain lighting <strong>and</strong> provide routine repairs.<br />

5. Permanent building lighting may be utilized during construction.<br />

C. Temporary Water Service<br />

1. County will pay cost of temporary water. Exercise measures to conserve<br />

water consumption. Utilize County's existing or new water system, extend<br />

<strong>and</strong> supplement with temporary devices as needed to maintain specified<br />

conditions for construction operations. Contractor will provide all backflow<br />

prevention devices acceptable to CPM.<br />

2. Extend branch piping with outlets located so water is available by hoses<br />

with threaded connections.<br />

3. CONTRACTOR may utilize existing hose bibs in the Palm Garage <strong>and</strong><br />

terminals for water use on the project. Coordinate with BCAD<br />

maintenance on connection to the water service lines. Do not connect to<br />

fire hydrants for water use.<br />

3.02 TEMPORARY CONSTRUCTION AND SUPPORT FACILITIES INSTALLATION<br />

Exhibit 2<br />

Page 296 of 379<br />

A. General: Locate field offices, storage sheds, sanitary facilities <strong>and</strong> other<br />

temporary construction <strong>and</strong> support facilities as indicated or as directed by CPM.<br />

1. Maintain temporary construction <strong>and</strong> support facilities until near<br />

Substantial Completion. Remove prior to Substantial Completion.<br />

Personnel remaining after Substantial Completion will be permitted to use<br />

BCAD provided facilities, under conditions acceptable to the CPM.<br />

Section 01500 Temporary Facilities Page 91