DIVISION 1 SPECIFICATIONS<br />

SECTION 01255 CPEAM PROCEDURES<br />

Exhibit 2<br />

Page 238 of 379<br />

1.06 HOURS OF WORK<br />

Work hours shall comply with the Project Schedule requirements. Work may<br />

proceed at any time (24 hours a day).<br />

1.07 DAILY CLEAN-UP AND TRASH REMOVAL<br />

A. Debris from this Work shall be promptly removed from the site as required or at<br />

least weekly as required by the CPM. Debris shall not be allowed to become a<br />

hazard to the safety of the public or enter the AOA. Areas occupied by the<br />

County <strong>and</strong> Building Tenants shall be kept clean at all times. Any dumpsters<br />

utilized shall be covered sufficiently to prevent debris from entering or<br />

contaminating the airfield.<br />

B. The CONTRACTOR shall be responsible for clean-up <strong>and</strong> trash removal.<br />

Accumulation of trash debris will not be allowed <strong>and</strong> the CPM may at any time<br />

direct the CONTRACTOR to immediately remove his trash <strong>and</strong> debris from the<br />

site of the Work when in the opinion of the CPM such trash constitutes a<br />

nuisance or in any way hinders the Work or the Airport’s operations. If the<br />

CONTRACTOR should fail to remove his trash <strong>and</strong> debris from the site of the<br />

Work in a timely manner, the CPM may have this Work performed <strong>and</strong> deduct<br />

the cost of such from CONTRACTOR’s payment.<br />

1.08 CLEANING AND PROTECTION<br />

A. During h<strong>and</strong>ling <strong>and</strong> installation of Work at the Project Site, CONTRACTOR shall<br />

clean <strong>and</strong> protect Work in progress <strong>and</strong> adjoining Work on the basis of<br />

continuous daily maintenance. CONTRACTOR shall also apply protective<br />

covering on installed Work to ensure freedom from damage or deterioration.<br />

B. CONTRACTOR shall clean <strong>and</strong> perform maintenance on installed Work as<br />

frequently as necessary through the remainder of the construction period <strong>and</strong><br />

adjust <strong>and</strong> lubricate operable components to ensure operability without damaging<br />

effects.<br />

C. Limiting Exposures of Work. To the extent possible through appropriate control<br />

<strong>and</strong> protection methods, CONTRACTOR shall supervise performance of the<br />

Work in such a manner <strong>and</strong> by such means which will ensure that none of the<br />

Work, whether completed or in progress, will be subjected to harmful,<br />

dangerous, damaging or otherwise deleterious exposure during the construction<br />

period. Such exposures include, where applicable, but not by way of limitation<br />

the following:<br />

1. Excessive static or dynamic loading.<br />

Section 01255 CPEAM Procedures Page 33