01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 1 SPECIFICATIONS<br />

SECTION 1045 CUTTING AND PATCHING<br />

Exhibit 2<br />

Page 220 of 379<br />

PART 2 - PRODUCTS<br />

2.01 MATERIALS<br />

A. Use materials for cutting <strong>and</strong> patching that are identical to existing materials. If<br />

identical materials are not available, or cannot be used, use materials that match<br />

existing adjacent surfaces to fullest extent possible with regard to visual effect.<br />

B. Use materials for cutting <strong>and</strong> patching that will result in equal-or-better<br />

performance characteristics.<br />

C. Comply with specifications <strong>and</strong> st<strong>and</strong>ards for each specific product involved.<br />

PART 3 - EXECUTION<br />

3.01 EXAMINATION<br />

A. Before cutting, examine surfaces <strong>and</strong> conditions under which Work is to be<br />

performed. If unsafe or otherwise unsatisfactory conditions are encountered,<br />

take corrective action before proceeding with Work.<br />

B. Before start of cutting Work, meet at Work Site with all parties involved in cutting<br />

<strong>and</strong> patching, including mechanical <strong>and</strong> electrical trades. Review areas of<br />

potential interference <strong>and</strong> conflict <strong>between</strong> various trades. Coordinate layout of<br />

Work <strong>and</strong> resolve potential conflict before proceeding with Work.<br />

3.02 PREPARATION<br />

A. Provide adequate temporary support as necessary to assure structural value or<br />

integrity of affected portion of Work.<br />

B. Protect other Work during cutting <strong>and</strong> patching to prevent damage. Provide<br />

protection from adverse weather conditions for that part of project that may be<br />

exposed during or after cutting <strong>and</strong> patching operations.<br />

C. Avoid interference with use of adjoining areas or interruption of free passage to<br />

adjoining areas.<br />

D. Take precautions not to cut existing pipe, conduit, or duct serving building but<br />

schedule to be relocated until provisions have been made to bypass them.<br />

Section 01045 Cutting <strong>and</strong> Patching Page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!