DIVISION 1 SPECIFICATIONS<br />

SECTION 01340 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES<br />

6. Schedule date of delivery of pertinent items to the Project.<br />

1.04 PROCEDURE REQUIREMENTS<br />

Exhibit 2<br />

Page 273 of 379<br />

A. Coordination: Coordinate the preparation <strong>and</strong> processing of submittals with the<br />

performance of the Work. Coordinate each separate submittal with other<br />

submittals <strong>and</strong> related activities such as testing, purchasing, fabrication, delivery<br />

<strong>and</strong> similar activities that require sequential activity.<br />

1. Coordinate the submittal of different units of interrelated Work so that one<br />

submittal will not be delayed by either the CPM’s or the CONSULTANT’s<br />

need to review a related submittal. The CONSULTANT <strong>and</strong> CPM reserve<br />

the right to withhold action on any submittal.<br />

2. Scheduling: In each appropriate administrative submittal, such as the<br />

Construction Schedule, show the principal Work-related submittals <strong>and</strong><br />

time requirements for coordination of submittal activity with related Work.<br />

3. Coordination of Submittals Times: Prepare <strong>and</strong> transmit each submittal<br />

to the CPM <strong>and</strong> CONSULTANT sufficiently in advance of the scheduled<br />

performance of related Work <strong>and</strong> other applicable activities. Transmit<br />

different kinds of submittals for the same unit of Work so that processing<br />

will not be delayed by the CPM’s <strong>and</strong> the CONSULTANT’s need to review<br />

submittals concurrently for coordination.<br />

4. Coordinate both procedural timing <strong>and</strong> listing, including naming <strong>and</strong><br />

sequencing, or reports <strong>and</strong> activities required by provisions of this Section<br />

<strong>and</strong> other Sections, to afford consistency <strong>and</strong> logical coordination<br />

<strong>between</strong> submitted reports or lists. Maintain coordination <strong>and</strong> correlation<br />

<strong>between</strong> separate reports by updating at monthly or shorter time intervals.<br />

Make appropriate distribution of each report <strong>and</strong> updated report to entities<br />

involved in Work.<br />

5. Review Time: Allow sufficient time so that the installation will not be<br />

delayed as a result of the time required to properly process submittals,<br />

including time for resubmittal, if necessary.<br />

a. Allow a minimum of fourteen (14) calendar days for the CPM’s<br />

<strong>and</strong> CONSULTANT’s initial processing of each submittal. The<br />

CPM <strong>and</strong> the CONSULTANT will advise the CONTRACTOR<br />

promptly when it is determined that a submittal being processed<br />

must be delayed for coordination. Note that the CPM <strong>and</strong> the<br />

CONSULTANT will not make color; texture, pattern <strong>and</strong> similar<br />

finish selections until all initial submittal requirements for all finish<br />

selections have been fulfilled.<br />

b. Allow a minimum of fourteen (14) calendar days for reprocessing<br />

each submittal.<br />

c. No Contract Time extension shall be authorized because of the<br />

CONTRACTOR’s failure to transmit submittals to the CPM <strong>and</strong> the<br />

CONSULTANT sufficiently in advance of the Work <strong>and</strong> in<br />

accordance with the approved submittal schedule.<br />

6. No claim shall be allowed on account of failure of the CONSULTANT to<br />

furnish Drawings, Specifications or instructions or to return Shop<br />

Drawings or Samples, pursuant to paragraph 4 above, until five (5)<br />

Section 01340 Shop Drawings, Product Data <strong>and</strong> Samples Page 68