DIVISION 1 SPECIFICATIONS<br />

SECTION 01050 FIELD ENGINEERING<br />

Exhibit 2<br />

Page 224 of 379<br />

Surveyor shall certify as to the actual location of the constructed facilities in<br />

relation to property lines, building lines, easements, <strong>and</strong> other restrictive<br />

boundaries.<br />

C. Procedure: The CONTRACTOR shall:<br />

1. Verify layout information indicated in relation to property survey <strong>and</strong><br />

existing benchmarks, before proceeding with layout of actual Work.<br />

2. As Work proceeds, check major element for line, levels, <strong>and</strong> plumb.<br />

3. Maintain accurate surveyor’s log or record book of such checks, available<br />

for CPM’s <strong>and</strong> CONSULTANT’s reference at reasonable times.<br />

4. Record deviations from required lines <strong>and</strong> levels.<br />

5. Advise CPM promptly upon detection of deviations exceeding indicated or<br />

recognized tolerances.<br />

6. Record deviations, which are accepted on Project Record Drawings.<br />

1.03 RECORDS: The CONTRACTOR shall:<br />

A. Maintain complete, accurate log of control <strong>and</strong> survey Work as it progresses.<br />

B. On completion of foundation walls <strong>and</strong> major site improvements, prepare certified<br />

survey showing dimensions, locations, angles, <strong>and</strong> elevations of construction.<br />

C. Final Property Surveys: The CONTRACTOR shall:<br />

1. Immediately before time of Substantial Completion, prepare final property<br />

survey showing significant features resulting from construction of project.<br />

2. Include on survey certification, signed by surveyor, to the effect that<br />

principal lines <strong>and</strong> levels of project are accurately positioned as shown on<br />

survey.<br />

D. Survey Copies: Furnish two (2) copies of survey data, except furnish ten (10)<br />

copies of final property survey. Surveys shall also be provided in CAD <strong>and</strong> PDF<br />

Format on a CD.<br />

E. Records of Actual Work: Furnish four (4) copies, one of which will be returned for<br />

inclusion in Project Record Documents as specified in Contract Closeout Section<br />

01700. Records of Actual Work shall also be provided in ACAD <strong>and</strong> PDF format<br />

on a CD when required by the CPM.<br />

1.04 UNDERGROUND OBSTRUCTIONS<br />

A. Pipe lines, existing underground installation, <strong>and</strong> underground structures in<br />

vicinity of Work are shown on Drawings according to best information available.<br />

Section 01050 Field Engineering Page 19