01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01630 SUBSTITUTIONS AND PRODUCT OPTIONS<br />

Exhibit 2<br />

Page 325 of 379<br />

D. Only one (1) request for substitution for each product will be considered. When<br />

substitution is not accepted, provide specified product.<br />

E. Substitution requests will be approved by the CPM <strong>and</strong> CONSULTANT.<br />

1.04 REQUESTS FOR SUBSTITUTIONS<br />

A. Submit separate request for each substitution. Document each request with<br />

complete data substantiating compliance of proposed substitution with<br />

requirements of Contract Documents.<br />

B. Identify product by Specifications section <strong>and</strong> Article numbers. Provide<br />

manufacturer’s name <strong>and</strong> address, trade name of product, <strong>and</strong> model or catalog<br />

number. List fabricators <strong>and</strong> suppliers as appropriate.<br />

C. Attach product data as specified in Section 01340.<br />

D. List similar projects using product, dates of installation, <strong>and</strong> names of CPM <strong>and</strong><br />

CONSULTANT.<br />

E. Give itemized comparison of proposed substitution with specified product, listing<br />

variations, <strong>and</strong> reference to Specifications section <strong>and</strong> Article numbers.<br />

F. Give itemized comparison of proposed substitution <strong>and</strong> the specified product.<br />

G. Give cost data comparing proposed substitution with specified product, <strong>and</strong><br />

amount of net change to Contract Sum.<br />

H<br />

List availability of maintenance services <strong>and</strong> replacement materials.<br />

I. State effects of substitution on construction schedule, <strong>and</strong> changes required in<br />

other work or products.<br />

1.05 CONTRACTOR REPRESENTATION<br />

A. Request for substitution constitutes a representation that the CONTRACTOR has<br />

investigated proposed product <strong>and</strong> has determined that it is equal to or superior<br />

in all respects to specified product.<br />

B. Contractor will provide the same warranty for substitution as for specified<br />

product.<br />

C. Contractor will coordinate installation of accepted substitute, making such<br />

changes as may be required for Work to be complete in all respects.<br />

D. Contractor certifies that cost data presented is complete <strong>and</strong> includes all related<br />

costs under this Contract.<br />

Section 01630 Substitutions <strong>and</strong> Product Options Page 120

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!