01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01545 UTILITIES<br />

Exhibit 2<br />

Page 317 of 379<br />

to prevent further damage or interruption of service. The CONTRACTOR, in<br />

such events, shall cooperate with the utility service or FAA facility <strong>and</strong> the CPM<br />

continuously until such damage has been repaired <strong>and</strong> service restored to the<br />

satisfaction of the utility service or FAA facility.<br />

K. The CONTRACTOR shall immediately repair, at his own expense, with identical<br />

material by skilled workmen, all utilities, FAA cables <strong>and</strong> other facilities, which<br />

are damaged by his workmen, equipment, or Work. Prior approval of the<br />

appropriate utility service <strong>and</strong>/or FAA facility shall be obtained from the CPM for<br />

the materials, workmen, time of day or night, method of repairs, <strong>and</strong> any<br />

temporary or permanent repairs the CONTRACTOR may propose to any FAA<br />

cables or utility service damaged by the CONTRACTOR during the course of the<br />

Work.<br />

L. The Airport's publicly owned facilities <strong>and</strong> privately owned facilities located on<br />

Airport property, including underground cables, pavements, piping, buildings,<br />

turfed areas, vehicles, <strong>and</strong> other facilities <strong>and</strong> improvements, that are damaged<br />

by the CONTRACTOR, shall, at the election of the CPM, be replaced or repaired<br />

by the CONTRACTOR to the satisfaction of the CPM at the CONTRACTOR’s<br />

expense. If said repairs do not commence within five calendar days of written<br />

notice by the CPM, the <strong>COUNTY</strong> may proceed with the repair work <strong>and</strong> charge<br />

the CONTRACTOR for all costs or withhold payment to CONTRACTOR for said<br />

repairs. Approval of the repair vests with the entity with jurisdiction over the<br />

facility.<br />

PART 2 - PRODUCTS<br />

(Not Used)<br />

PART 3 - EXECUTION<br />

(Not Used)<br />

END OF SECTION- UTILITIES<br />

Section 01545 Utilities Page 112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!