Exhibit 2<br />

Page 311 of 379<br />

DIVISION 1 SPECIFICATIONS<br />

SECTION 01540 CONSTRUCTION SAFETY PLAN AND SECURITY REQUIREMENTS<br />

Subcontractor vehicles authorized to operate on the site <strong>and</strong> shall issue a<br />

permit to each vehicle to be made available upon dem<strong>and</strong> by the CPM or<br />

any Airport Security Officer. Vehicle permits shall be assigned in a<br />

manner to assure positive identification of the vehicle at all times. In lieu<br />

of issuing individual vehicle permits, the CSO can require each vehicle to<br />

display a large company sign on both sides of the vehicle <strong>and</strong> advise the<br />

<strong>COUNTY</strong> through the CPM of a current list of companies authorized to<br />

enter <strong>and</strong> conduct Work on the Airport.<br />

4. EMPLOYEE PARKING:<br />

a. Area for parking of the CONTRACTOR’s employee’s vehicles is in<br />

the CONTRACTOR’s Construction Area as provided by the CPM.<br />

Parking shall be accomplished in straight equally spaced rows.<br />

CONTRACTOR shall organize traffic flow <strong>and</strong> parking patterns,<br />

supply traffic control signs <strong>and</strong> markings, subject to the approval<br />

of the CPM. The CONTRACTOR shall maintain the parking<br />

surface <strong>and</strong> pick up trash daily. No storage will be allowed on the<br />

parking site. The CONTRACTOR shall restore the shape <strong>and</strong><br />

grade of this parking area upon the job completion, see <strong>and</strong> mulch<br />

portions where existing ground cover is damaged <strong>and</strong> perform all<br />

Work required to restore the area to its original condition.<br />

b. All vehicles that are parked in the CONTRACTOR’s Construction<br />

Area shall have an identification sticker as directed by the CPM.<br />

Stickers shall be supplied by the CONTRACTOR <strong>and</strong> state the<br />

project number <strong>and</strong> CONTRACTOR’s name. Vehicles shall be<br />

parked so that identification stickers are visible from the parking<br />

lot driving lanes at all times. The CONTRACTOR shall provide<br />

transportation for his employees from the parking area to the Work<br />

site using company owned vehicles.<br />

c. When the CONTRACTOR’s employees parking area is adjacent<br />

to another CONTRACTOR’s parking area performing other<br />

construction for the <strong>COUNTY</strong>, cooperation <strong>between</strong> Contractors is<br />

required to avoid any interferences in the performance of each<br />

others respective construction. Any difficulties experienced shall<br />

be brought to the attention of the CPM immediately.<br />

5. Materials Delivery to the Site: All Contractor’s material orders for delivery<br />

to the Work site will use as a delivery address, the street name <strong>and</strong><br />

number assigned to the access point onto the airport.<br />

6. Security Background verification, fingerprinting <strong>and</strong> identification badging<br />

is required for all work conducted in Security Identification Display Areas<br />

(SIDA). The prime contractor is responsible for managing, obtaining <strong>and</strong><br />

complying with all TSA <strong>and</strong> Airport security <strong>and</strong> badging requirements for<br />

their own firm as well as all of their subcontractors on their team. The<br />

prime contractor <strong>and</strong> all subcontractors are responsible for all costs<br />

associated with complying with the terms <strong>and</strong> conditions of all security<br />

requirement including but not limited to any fines levied (including against<br />

BCAD) due to non compliance with SIDA or Airport Security rules.<br />

PART 2 – PRODUCTS<br />

(Not Used)<br />

Section 01540 Construction Plan <strong>and</strong> Safety Requirements Page 106