01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit 2<br />

Page 61 of 379<br />

Terminal 4 Gate Replacement – Western Expansion<br />

19.6 Safety <strong>and</strong> Protection:<br />

19.6.1 CONTRACTOR shall be solely responsible for initiating, maintaining <strong>and</strong><br />

supervising all safety precautions <strong>and</strong> programs in connection with the Project.<br />

CONTRACTOR shall take all necessary precautions for the safety of, <strong>and</strong> shall<br />

provide the necessary protection to prevent damage, injury or loss to:<br />

19.6.1.1 All employees <strong>and</strong> Subcontractors on the work site <strong>and</strong> other persons<br />

who may be affected thereby;<br />

19.6.1.2 All the work <strong>and</strong> all materials or equipment to be incorporated therein,<br />

whether in storage on or off the Project site;<br />

19.6.1.3 Other property at the Project site or adjacent thereto, including trees,<br />

shrubs, lawns, walks, pavements, roadways, structures <strong>and</strong> utilities not<br />

designated for removal, relocation or replacement in the course of<br />

construction; <strong>and</strong><br />

19.6.1.4 Aircraft, people, <strong>and</strong> vehicles through a Maintenance of Traffic (MOT)<br />

plan.<br />

19.6.2 CONTRACTOR shall comply with all applicable laws, ordinances, rules,<br />

regulations <strong>and</strong> orders of any public body having jurisdiction for the safety of<br />

persons or property or to protect them from damage, injury or loss; <strong>and</strong> shall<br />

erect <strong>and</strong> maintain all necessary safeguards for such safety <strong>and</strong> protection.<br />

CONTRACTOR shall notify owners of adjacent property <strong>and</strong> utilities when<br />

prosecution of the work may affect them. All damage, injury or loss to any<br />

property referred to in Sections 19.6.1.3 <strong>and</strong> 19.6.1.4 above, caused directly or<br />

indirectly, in whole or in part, by CONTRACTOR, any Subcontractor or anyone<br />

directly or indirectly employed by any of them or anyone for whose acts any of<br />

them may be liable, shall be remedied by CONTRACTOR. CONTRACTOR's<br />

duties <strong>and</strong> responsibilities for the safety <strong>and</strong> protection of the work shall<br />

continue until such time as all the Work is completed <strong>and</strong> PMO has issued a<br />

notice to <strong>COUNTY</strong> <strong>and</strong> CONTRACTOR that the Work is acceptable except as<br />

otherwise provided in Article 6.5 hereof. Provided that this Section is not<br />

intended to preclude, or in any way limit the right of the CONTRACTOR to<br />

assert it's rights, submit a claim, or seek recovery under any applicable policy of<br />

insurance, including but not limited the OCIP coverage's.<br />

19.6.3 CONTRACTOR shall designate a responsible member of its organization at the<br />

Work site whose duty shall be the prevention of accidents. This person shall be<br />

CONTRACTOR'S project manager unless otherwise designated in writing by<br />

CONTRACTOR to <strong>COUNTY</strong>. This person shall work with the Owner Controlled<br />

Insurance Program (OCIP) Safety Director <strong>and</strong> his/her designated staff<br />

19.6.4 Contractor shall establish weekly Toolbox talks with employees to review safe<br />

work requirements. Such talks shall be documented <strong>and</strong> all participants shall sign<br />

a sign-in sheet to verify attendance. Refer to the OCIP Safety Manual, Exhibit 7,<br />

for additional information on Toolbox talks.<br />

CM @ Risk Agreement R0787918R1 Page 60 of 85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!