DIVISION 1 SPECIFICATIONS<br />

SECTION 01545 UTILITIES<br />

Exhibit 2<br />

Page 315 of 379<br />

PART 1 - GENERAL<br />

1.01 REQUIREMENTS INCLUDED<br />

A. Existing facilities, utilities, <strong>and</strong> features depicted on the Drawings are not<br />

guaranteed to be accurate with respect to location, condition, <strong>and</strong> characteristics.<br />

Also, there may be additional facilities, utilities, <strong>and</strong> features existing that could<br />

affect the Work, which are not depicted or described in the Contract Documents.<br />

B. Prior to Bidding, the CONTRACTOR shall make a thorough investigation of the<br />

Project area to satisfy himself as to the location, condition, <strong>and</strong> characteristics of<br />

any <strong>and</strong> all facilities, utilities, <strong>and</strong> features which may affect his Work.<br />

C. The CONTRACTOR hereby agrees to make no claims against the <strong>COUNTY</strong>,<br />

CPM or the CONSULTANT <strong>and</strong>/or their representatives relating to the existence<br />

or lack of, location, condition, <strong>and</strong>/or characteristics of any existing facilities,<br />

utilities, or features that is shown on the construction plans provided.<br />

D. The CONTRACTOR shall not install any restrictive device, including but not<br />

limited to mud plugs, in any storm drain line or structure without written approval<br />

from the CPM. A CPM Representative must be present during the installation<br />

<strong>and</strong> removal of any restrictive device. Damage caused by flooding as the result<br />

of a restrictive device shall be repaired <strong>and</strong>/or replaced by the CONTRACTOR to<br />

satisfactory conditions acceptable to the CPM at no additional cost to the<br />

<strong>COUNTY</strong>.<br />

1.02 PROTECTION OF EXISTING UTILITIES<br />

A. The term “utilities” includes FAA power <strong>and</strong> control cables, FP&L Power Lines,<br />

Telephone cables, lines <strong>and</strong> fiberoptics, Sheriff’s Department Lines, airline<br />

communication cables, airfield lighting cables, <strong>COUNTY</strong> underground electrical,<br />

revenue control, communications lines, cables, <strong>and</strong> fiber optics, water lines,<br />

drainage lines, irrigation lines, HVAC equipment, sanitary force main, sanitary<br />

lines, <strong>and</strong> fuel <strong>and</strong> gas lines <strong>and</strong> any other supportive utility facility. These<br />

utilities may be located in the areas of demolition <strong>and</strong> construction. Disruption of<br />

these utilities could seriously disrupt operation of the Airport. Although the<br />

Drawings tend to located cables <strong>and</strong> utilities, actual locations are uncertain. The<br />

CONTRACTOR is required to verify all locations, in accordance with Florida<br />

Statute 556.101-111, “Underground Facility Damage Prevention <strong>and</strong> Safety Act”.<br />

The CONTRACTOR shall call Sunshine State One-Call of Florida, Inc. at 1-800-<br />

432-4770 <strong>and</strong> the CPM prior to any <strong>and</strong> all digging operations.<br />

B. Any intentional interruption of existing utilities for the purpose of carrying out the<br />

Work shall be carried out in a manner to minimize the length of scope of the<br />

interruption. Before any such interruption, the CONTRACTOR shall give a<br />

minimum of 48 hours written notice to the CPM.<br />

Section 01545 Utilities Page 110