01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01255 CPEAM PROCEDURES<br />

Exhibit 2<br />

Page 235 of 379<br />

1. When the Work requires closing an Air Operations Area (AOA) of the<br />

Airport or portion of such area, the CONTRACTOR shall furnish, erect,<br />

<strong>and</strong> maintain temporary markings <strong>and</strong> associated lighting conforming to<br />

the requirements specified in the Contract Documents as applicable, or of<br />

FAA Advisory Circular 150/5340-1E, “Marking of Paved Areas on<br />

Airports.”<br />

2. The CONTRACTOR shall furnish <strong>and</strong> erect all barricades, warning signs,<br />

<strong>and</strong> markings for hazards prior to commencing Work, which requires such<br />

erection <strong>and</strong> shall maintain the barricades, warning signs, <strong>and</strong> markings<br />

for hazards until their dismantling is directed by the CONSULTANT.<br />

3. Refer to Section 01540 - CONSTRUCTION SAFETY PLAN AND<br />

SECURITY REQUIREMENTS for additional requirements.<br />

O. Maintenance of Devices <strong>and</strong> Barriers: Traffic control devices, warning devices<br />

<strong>and</strong> barriers shall be kept in the correct position, properly directed, clearly visible<br />

<strong>and</strong> clean, at all times. Damaged, defaced, or dirty devices or barriers shall<br />

immediately be repaired, replaced or cleaned as directed.<br />

P. Flagmen: The CONTRACTOR shall provide competent flagmen to direct traffic<br />

where one-way operation in a single lane is in effect, where airside traffic<br />

movement is affected by CONTRACTOR’s operations, <strong>and</strong> in other situations as<br />

may be required by the st<strong>and</strong>ards established herein.<br />

Q. CONTRACTOR Signing: The CONTRACTOR may furnish <strong>and</strong> install<br />

construction traffic directional signs along the existing traffic route. The signs<br />

shall depict CONTRACTOR’s logo or name, directional arrows <strong>and</strong> “deliveries.”<br />

Signs shall be of sufficient size to have 6” high message <strong>and</strong> shall be located at<br />

each decision point. The CPM shall approve all signs <strong>and</strong> their locations. NO<br />

OTHER SIGNS ARE PERMITTED WITHIN THE AIRPORT COMPLEX.<br />

R. Material Deliveries: The CONTRACTOR shall make his own material <strong>and</strong><br />

equipment deliveries. Vendors or suppliers shall make no deliveries without a<br />

representative of the CONTRACTOR being present to coordinate it.<br />

S. All dollies, floats or other conveyances used for debris removal shall be rubber<br />

tired, box type, <strong>and</strong> lined with plastic barrier to prevent debris falling from the<br />

cart. All carts are to be loaded within the confines of the dust barrier. Transport<br />

of debris through public spaces, if permitted, will be made only after coordination<br />

of times <strong>and</strong> routes with the CPM.<br />

T. Notification: On days when construction traffic is expected to be extra heavy or<br />

when oversized pieces of equipment are to be delivered, give the CPM a<br />

minimum of seventy-two (72) hours notice prior to the event.<br />

Section 01255 CPEAM Procedures Page 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!