DIVISION 1 SPECIFICATIONS<br />

SECTION 01050 FIELD ENGINEERING<br />

Exhibit 2<br />

Page 225 of 379<br />

B. The CONTRACTOR shall verify location of underground pipelines, conduits, <strong>and</strong><br />

structures by h<strong>and</strong> probing in advance of excavation.<br />

C. The CONTRACTOR shall request written permission from the CPM five (5)<br />

business days before initiating new construction or demolitions over existing<br />

utilities including irrigation.<br />

D. The CONTRACTOR shall repair cuts to existing utilities made during construction<br />

process as part of Project Work to the satisfaction of the CPM without an<br />

increase to the GMP.<br />

PART 2 - PRODUCTS<br />

(Not Used)<br />

PART 3 - EXECUTION<br />

3.01 EXAMINATION<br />

A. General: Verify layout information shown on the Drawings, in relation to the<br />

property survey <strong>and</strong> existing benchmarks, before proceeding to lay out the Work.<br />

Locate <strong>and</strong> protect existing benchmarks <strong>and</strong> control points. Preserve permanent<br />

reference points during construction.<br />

1. Do not change or relocate benchmarks or control points without prior<br />

written approval. Promptly report lost or destroyed reference points or<br />

requirements to relocate reference points because of necessary changes<br />

in grade or locations.<br />

2. Promptly replace lost or destroyed Project control points. Base<br />

requirements on the original survey control points.<br />

B. Establish <strong>and</strong> maintain a minimum of 2 permanent benchmarks on the site,<br />

referenced to data established by survey control points.<br />

1. Record benchmarks locations, with horizontal <strong>and</strong> vertical data, on Asbuilt<br />

drawings. Datum for horizontal <strong>and</strong> vertical controls shall be as<br />

established in the Project Contract Documents.<br />

C. Existing Utilities <strong>and</strong> Equipment: The existence <strong>and</strong> location of underground <strong>and</strong><br />

other utilities <strong>and</strong> construction indicated as existing are not guaranteed. Before<br />

beginning site work, investigate <strong>and</strong> verify the existence <strong>and</strong> location of<br />

underground utilities <strong>and</strong> other construction.<br />

1. CONTRACTOR procedures to be followed as defined in THE CM-AT<br />

RISK CONTRACT (CMR).<br />

Section 01050 Field Engineering Page 20