01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01540 CONSTRUCTION SAFETY PLAN AND SECURITY REQUIREMENTS<br />

HOT WORK PERMIT<br />

Hot Work Permit for ______________________________________ (Name of Project)<br />

Date____________ Time____________<br />

Area____________ Dept____________<br />

Location of work________________________________________________________<br />

Work to be done________________________________________________________<br />

Special precautions _____________________________________________________<br />

Is fire watch required ___________________________________________________<br />

If yes, Person responsible for fire watch______________________________________<br />

Person responsible for welding_____________________________________________<br />

This location will be examined, <strong>and</strong> the necessary precautions taken.<br />

(By supervisor of Company performing the welding)<br />

Time started____________ Time Completed____________<br />

Fire checks must be performed <strong>and</strong> signed AFTER HOT WORK IS COMPLETED.<br />

30 minute By_________________________<br />

(Permit Holder)<br />

1-2 hour By__________________________<br />

(Permit Holder/Designee)<br />

INITIAL CHECK TO BE FILLED OUT PRIOR TO START OF JOB<br />

Equipment to be used in good repair<br />

Area (3 meters) clear of combustibles <strong>and</strong> flammables<br />

Fire extinguisher(s)<br />

Water hose<br />

Not within 8 meters of explosives<br />

Not within a smoking area<br />

Area to be wetted down<br />

All wall <strong>and</strong> floor openings covered<br />

Equipment cleaned of all combustibles <strong>and</strong> flammables<br />

Containers purged of flammable vapors<br />

Combustibles <strong>and</strong> flammable liquids protected with covers, guards, or metal shields<br />

Area secured/guarded<br />

No work is to be performed without checklist being completed <strong>and</strong> complied with<br />

Completed by____________________________<br />

(Permit Holder)<br />

Time_______________ Date________________<br />

Permission is granted for this work after the INITIAL CHECK is completed <strong>and</strong> signed by<br />

the Permit Holder, CPM, <strong>and</strong> the CMR.<br />

Program Manager ________________________<br />

Time_______________ Date________________<br />

Exhibit 2<br />

Page 313 of 379<br />

Managing General Contractor_________________________<br />

Time_______________ Date_________________<br />

All costs incurred as a result of the issuance of the Hot Work Permit shall be borne by<br />

the permit holder.<br />

This form must be submitted 24 hours prior to commencement of the work.<br />

Section 01540 Construction Plan <strong>and</strong> Safety Requirements Page 108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!