DIVISION 1 SPECIFICATIONS<br />

SECTION 1045 CUTTING AND PATCHING<br />

Exhibit 2<br />

Page 221 of 379<br />

3.03 CUTTING<br />

A. Cut Work using methods that is least likely to damage work to be retained or<br />

adjoining Work.<br />

B. Use small power tools designed for sawing or grinding, not hammering <strong>and</strong><br />

chopping. Cut through concrete <strong>and</strong> masonry using cutting machine such as<br />

carborundum saw or core drill to ensure a neat hole. Cut holes <strong>and</strong> slots neatly<br />

to size required with minimum disturbance of adjacent Work. To avoid marring<br />

existing finished surfaces, cut or drill from exposed or finished side into<br />

concealed surfaces. Temporarily cover openings when not in use.<br />

C. Bypass utility services such as pipe <strong>and</strong> conduit, before cutting, where such utility<br />

services are shown or required to be removed, relocated, or ab<strong>and</strong>oned. Cut-off<br />

conduit <strong>and</strong> pipe in walls or partitions to be removed. After bypass <strong>and</strong> cutting,<br />

cap, valve, or plug <strong>and</strong> seal tight remaining portion of pipe <strong>and</strong> conduit to prevent<br />

entrance of moisture or other foreign matter.<br />

D. Do not cut <strong>and</strong> patch operational elements or safety related components in a<br />

manner that would result in reduction of capacity to perform in manner intended,<br />

including energy performance or that would result in increased maintenance,<br />

decreased operational life or decreased safety.<br />

E. Do not cut <strong>and</strong> patch Work in a manner that would result in substantial visual<br />

evidence of cut <strong>and</strong> patch Work. Remove <strong>and</strong> replace Work judged by the CPM<br />

to be cut <strong>and</strong> patched in a visually unsatisfactory manner.<br />

3.04 PATCHING<br />

A. Patch with seams, which are durable <strong>and</strong> as invisible as possible. Comply with<br />

specified tolerances for Work.<br />

B. Where feasible, inspect <strong>and</strong> test patched areas to demonstrate integrity of Work.<br />

C. Restore exposed finishes of patched areas <strong>and</strong> where necessary extend finished<br />

restoration into retained adjoining Work in a manner which will eliminate<br />

evidence of patching <strong>and</strong> refinishing.<br />

D. Install new products to complete Work in accordance with requirements of<br />

Contract Documents.<br />

3.05 ADJUSTING<br />

A. Restore damaged pipe covering to original conditions.<br />

Section 01045 Cutting <strong>and</strong> Patching Page 16