01.01.2015 Views

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

AGREEMENT between BROWARD COUNTY and Cummings ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DIVISION 1 SPECIFICATIONS<br />

SECTION 01050 FIELD ENGINEERING<br />

Exhibit 2<br />

Page 223 of 379<br />

PART 1 - GENERAL<br />

1.01 REQUIREMENTS INCLUDED<br />

A. Data furnished by the <strong>COUNTY</strong>, the CPM or the CONSULTANT will locate <strong>and</strong><br />

reference survey base lines <strong>and</strong> will establish benchmarks at appropriate<br />

intervals along the base line to facilitate the proper layout of the Work by the<br />

CONTRACTOR. The CONTRACTOR shall preserve all reference points <strong>and</strong><br />

benchmarks furnished by the <strong>COUNTY</strong>, the CPM or the CONSULTANT.<br />

B. The CONTRACTOR shall furnish all lines, grades, <strong>and</strong> measurements necessary<br />

to the proper prosecution <strong>and</strong> control of the Work under these Contract<br />

Documents. The Work shall include performing all calculations required <strong>and</strong><br />

setting all control needed, such as offsets, reference points, <strong>and</strong> other reference<br />

marks or points necessary to provide lines <strong>and</strong> grades for construction. The data<br />

furnished by the <strong>COUNTY</strong>, CPM or the CONSULTANT will establish horizontal<br />

<strong>and</strong> vertical control points only. The CONTRACTOR is thereafter responsible to<br />

maintain these control points for use by subsequent contractors.<br />

C. Horizontal <strong>and</strong> Vertical Control: The CONTRACTOR shall also establish<br />

horizontal <strong>and</strong> vertical controls for carrying out utility relocation or construction<br />

Work when such Work is included in the Contract.<br />

D. The CONTRACTOR shall establish the building grades, lines, levels, column,<br />

wall <strong>and</strong> partition lines required.<br />

E. The CONTRACTOR shall calculate <strong>and</strong> measure required dimensions indicated<br />

within recognized tolerances <strong>and</strong> should not scale drawings to determine<br />

dimensions.<br />

F. The CONTRACTOR shall advise subcontractors performing Work of marked<br />

lines <strong>and</strong> levels provided for use in layout of Work.<br />

1.02 SURVEY<br />

A. Surveyor: Engage L<strong>and</strong> Surveyor or Professional Engineer experienced <strong>and</strong><br />

specializing in l<strong>and</strong> survey Work, who is registered by the State of Florida to<br />

perform specified service.<br />

B. The CONTRACTOR shall retain a competent Registered Professional Engineer<br />

or Registered L<strong>and</strong> Surveyor, who shall establish the exterior lines <strong>and</strong> required<br />

elevations of all buildings <strong>and</strong> structures to be erected on the site <strong>and</strong> shall<br />

establish sufficient lines <strong>and</strong> grades for the construction of associated Work such<br />

as, but not limited to, roads, utilities <strong>and</strong> site grading. The Engineer or L<strong>and</strong><br />

Section 01050 Field Engineering Page 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!