Exhibit 2<br />

Page 303 of 379<br />

DIVISION 1 SPECIFICATIONS<br />

SECTION 01540 CONSTRUCTION SAFETY PLAN AND SECURITY REQUIREMENTS<br />

construction period, it is the CONTRACTOR’s responsibility to maintain each<br />

Work area in a safe, hazard free condition at all times. This will include<br />

barricades, fencing, taping up sharp corners or any other precautions necessary<br />

to protect the Public. Should the <strong>COUNTY</strong>, CONSULTANT or CPM find the area<br />

unsafe at any time, he shall notify the CONTRACTOR, <strong>and</strong> the CONTRACTOR<br />

shall take whatever steps necessary to remedy the unsafe condition. Should the<br />

CONTRACTOR not be immediately available for corrective action, the CPM may<br />

remedy the problem <strong>and</strong> the CONTRACTOR shall reimburse the <strong>COUNTY</strong> for<br />

the expense of such correction<br />

B. Fire Control: Flame cutting will be permitted only on steel parts that cannot be<br />

removed in any other manner <strong>and</strong> only when at least one person is st<strong>and</strong>ing by<br />

exclusively with a fire extinguisher within ten (10) feet of the Work <strong>and</strong> within full<br />

view of the area. The fire extinguisher shall have been tested <strong>and</strong> ready for use.<br />

The CONTRACTOR shall submit a fire protection plan to the CPM for approval<br />

prior to conducting the Work requiring said protection plan. A Hot Work Permit<br />

may be required as directed by the CPM.<br />

C. Work Near Fire Alarm: Caution shall be exercised as necessary when working<br />

near fire alarms so as not to accidentally activate fire alarms, doors or barriers.<br />

D<br />

Protection of Property: Fixed structures, equipment, paving, l<strong>and</strong>scaping <strong>and</strong><br />

vehicles (automobiles, trucks, etc.) shall be protected with drop cloths, shielding<br />

<strong>and</strong> other appropriate measures to assure maximum protection of all property<br />

<strong>and</strong> vehicles.<br />

1.03 GENERAL SAFETY REQUIREMENTS<br />

A. A construction/safety meeting will be conducted by the CPM after award of the<br />

Contract <strong>and</strong> prior to commencing construction. Additional construction/safety<br />

meetings may be scheduled as deemed necessary by the CPM throughout the<br />

life of the Contract. Representatives from the CONTRACTOR, CONSULTANT,<br />

CPM <strong>and</strong> any others deemed necessary by <strong>COUNTY</strong> or CPM, will attend. The<br />

CONTRACTOR shall also conduct Safety/Security meetings as deemed<br />

necessary by the CPM <strong>and</strong> three (3) copies of the minutes will be provided to the<br />

CPM within five (5) calendar days of the meeting. All Contractor <strong>and</strong><br />

Subcontractor supervisors are required to attend.<br />

B. The CONTRACTOR shall inform his supervisors <strong>and</strong> workmen of the airport<br />

activity <strong>and</strong> operations that are inherent to this airport, the safety regulations of<br />

the airport <strong>and</strong> the prohibition of driving or walking on any area of the Air<br />

Operations Area (AOA) without clearance. The CONTRACTOR shall conduct his<br />

construction activities to conform to both routine <strong>and</strong> emergency requirements, in<br />

full compliance with the Federal Aviation Administration (FAA) Advisory Circulars<br />

dealing with Safety <strong>and</strong> Security. The CONTRACTOR shall provide initial <strong>and</strong><br />

continuing instruction to all supervisors, employees, subcontractors <strong>and</strong> suppliers<br />

to enable them to conduct their Work in a manner that will provide the maximum<br />

safety with the least hindrance to air <strong>and</strong> ground traffic, the general public, airport<br />

employees <strong>and</strong> to the workmen employed on the Site.<br />

Section 01540 Construction Plan <strong>and</strong> Safety Requirements Page 98